Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-2 of 2
Keywords: perforation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Challenges and Lesson Learned of Water Shut-Off Campaigns in Umm-Gudair Field in Kuwait
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Water Lifecycle Management Conference and Exhibition, March 5–7, 2024
Paper Number: SPE-218991-MS
... to the failures: UG-A17 the wells drilled and completed in 1997 to perforate, stimulate, and complete with ESP. The workover was conducted in June 2000, primarily to shut off water production. TDT taken at this instance showed a 28 ft. rise in OWC in this well compared to the top transition as of 1997...
Proceedings Papers
Coning Control Completion Technology for Water Management
Available to PurchaseDalal AlSubaiei, Abdullah Al-Mousawi, Priya Kumar, Angel Ron, Shamseldin Zakrya, Mohammad Al-Husaini
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Water Lifecycle Management Conference and Exhibition, March 5–7, 2024
Paper Number: SPE-219059-MS
... component has its purpose and was designed according to the need of the well, the completion set can varies from well to well depending on the perforations interval of water and oil zones. After choosing the oil perforation interval and determining the water perforation interval for the upper zone...
Advertisement