1-4 of 4
Keywords: test section
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SNAME 29th American Towing Tank Conference, August 11–13, 2010
Paper Number: SNAME-ATTC-2010-034
... system. Mounting the model in the wind tunnel test section provided a challenge. The model needed to be mounted in a rigid configuration that could accommodate alignment and utilize the wind tunnel external balance six-component force measuring system (Barlow, et al, 1999, 2009). Supplementary drags...
Proceedings Papers

Paper presented at the SNAME 26th American Towing Tank Conference, July 23–24, 2001
Paper Number: SNAME-ATTC-2001-015
... and dynamic pressures. [Significant assistance provided by personnel from NWSC-CD, Sponsored by Code 333 of the Office of Naval Research]. upstream oil & gas test section transition production monitoring foil reynolds number production control transducer chord boundary layer transition...
Proceedings Papers

Paper presented at the SNAME 26th American Towing Tank Conference, July 23–24, 2001
Paper Number: SNAME-ATTC-2001-016
... research, development, and design organization is largely reviewed by considering the various cavitation tunnels which have been constructed and utilized at the David Taylor Model Basin over several decades. upstream oil & gas cavitation tunnel configuration velocity profile test section...
Proceedings Papers

Paper presented at the SNAME 23rd American Towing Tank Conference, June 11–12, 1992
Paper Number: SNAME-ATTC-1992-024
... reservoir surveillance noise lcc production control test section diameter diffuser cavitation channel evaluation inc lcc test section north america government reservoir characterization geometry requirement consideration contraction trough international symposium cavitation inception...

Product(s) added to cart

Close Modal