This paper outlines development studies for a large six degree-of-freedom dynamic test rig proposed for the IMD Clearwater Towing Tank. A full size pilot test rig, fully functional in the vertical plane, was built for this purpose. Tests were done on a static frame in air and water, using a 2 m long submarine hull model. A number of the principal test results are presented and discussed.

This content is only available via PDF.
You can access this article if you purchase or spend a download.