This paper outlines development studies for a large six degree-of-freedom dynamic test rig proposed for the IMD Clearwater Towing Tank. A full size pilot test rig, fully functional in the vertical plane, was built for this purpose. Tests were done on a static frame in air and water, using a 2 m long submarine hull model. A number of the principal test results are presented and discussed.
This content is only available via PDF.
Copyright 1992, The Society of Naval Architects and Marine Engineers
You can access this article if you purchase or spend a download.