1-20 of 19067 Search Results for

Trip

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 17–19, 2015
Paper Number: SPE-173108-MS
... Abstract This paper presents a model which aids the decision making process to determine the optimum point to trip out of hole to change a dulled drill bit. Drill bit interaction with abrasive rock and impact damage due to vibrations causes the state of wear or damage to cutters to increase...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 27–29, 2014
Paper Number: SPE-170876-MS
... Figure 2 Single Trip Plug and Abandonment System The HRU is placed directly above the standard section mill and is designed to only cut formation. The arms/blocks have PDC cutters all the way from the tip of the blade to the body OD, intentionally placed so that initial cut out...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-206167-MS
... trip. The reservoir is thick, with high permeability and characterized by high content of CO 2 and H 2 S. The underbalanced perforating technique was deemed fundamental to minimize formation damage in the near-wellbore area, and the campaign was part of a national strategic project to develop...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-205957-MS
... be cemented in hole if the running tool is unable to release. Single trip systems are attractive because they eliminate the need and costs associated with pulling drill pipe and deploying the tieback string, ultimately improving well delivery rates for the operator. The challenges with deploying...
Journal Articles
SPE Drill & Compl 36 (02): 459–472.
Paper Number: SPE-203057-PA
Published: 16 June 2021
...Ashutosh Dikshit; Amrendra Kumar; Glenn Woiceshyn Summary Interest is high in a method to reliably run single-trip completions without involving complex/expensive technologies ( Robertson et al. 2019 ). The reward for such a design would be reduced rig time, safety risks, and completion costs...
Proceedings Papers

Paper presented at the IADC/SPE Asia Pacific Drilling Technology Conference, June 8–9, 2021
Paper Number: SPE-201042-MS
... Abstract Gas lift is one of the most appropriate artificial lift methods for Gulf of Thailand (GOT) oil operations. As first described in Chapman, W. R. (2005) , Mono-trip gas lift (MTGL) completions have continuously improved since their implementation in the early 2000s, increasing recovery...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 23–April 1, 2021
Paper Number: IPTC-21783-MS
..., which can incur high cost because of the considerable rig time required for multizone operations, or alternate-path single-trip multizone completions that treat all the target zones simultaneously, with one pumping operation. However, this method does not allow for individual treatment to suit reservoir...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 23–April 1, 2021
Paper Number: IPTC-21782-MS
... to another. One of the most recent success case was the installation of One Trip 7" Multi Zone System that enabled implementation of an optimized High Rate Water Pack sand control operation in the casing size. This new technique helps to make more multi zone CHGP in infill or sidetracked wells feasible...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 23–April 1, 2021
Paper Number: IPTC-21791-MS
... are necessary to reduce capital expenditures (CAPEX) and create attractive projects. A marginal cluster consisting of three fields, namely PN, NL, and PR, is expected to reach its economic limit in the next 2 years. This paper elaborates on single-trip completion technology as a catalyst for drilling one infill...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 23–April 1, 2021
Paper Number: IPTC-21324-MS
... Abstract A multizone cased hole completion with a bottom hole assembly of world-record length at 2,600 ft was installed in Malaysia in November 2019 where three zones were simultaneously gravel packed in a single trip utilizing shunt tube technology. This sand control completion...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 8–12, 2021
Paper Number: SPE-204081-MS
... it difficult to drill vertical, curve, and lateral sections within a single trip with low tortuosity. To ensure tight inclination and azimuth control along tangent sections with high dogleg RSS, we introduce an on-board robust attitude control system and discuss its performance over several curve-lateral case...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202324-MS
... Figure 2 shows the hydraulic simulation results conducted using proprietary software during the feasibility study of the 7-in. single-trip multizone gravel pack system. Figure 2 Simulation Results from Proprietary Software Initially, a stacked gravel pack was planned for the T-82...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203057-MS
... Abstract Interest is high to reliably run single-trip completions without involving complex/expensive technologies. The reward: significantly reduced rig time and completion costs. As described herein, a unique pressure-activated sliding side door (PSSD) valve was developed and field-tested...
Proceedings Papers

Paper presented at the SPE Norway Subsurface Conference, November 2–3, 2020
Paper Number: SPE-200755-MS
... With the new approach to Formation integrity testing all these objectives could be achieved in a single run. The one trip system was estimated to save between 16-24 hours of rig time alone. The time saving of this approach has also been highlighted previous publications (Lucas et al 2018) se...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, October 29–30, 2020
Paper Number: SPE-200508-MS
... to prevent gas influxing on pumps down while using AFL to control the well while circulating. During tripping operations, the drill string is stripped to the heel and the vertical section of the wellbore are displaced with a statically overbalanced kill density mud. Displacements to kill density muds...
Proceedings Papers

Paper presented at the Offshore Technology Conference Asia, November 2–August 19, 2020
Paper Number: OTC-30043-MS
... Abstract Liner lap testing operations in the gas fields have evolved to include shoe track drill out operations in the same trip. Typically, a drilling BHA is run and spaced below an inflow test packer to drill out the shoe track to 20ft above the shoe. A landing sub or no-go lands in the liner...
Journal Articles
J Pet Technol 72 (10): 51–52.
Paper Number: SPE-1020-0051-JPT
Published: 01 October 2020
...Chris Carpenter This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 29943, “Seal Qualification and Single-Trip Lockdown Sleeve Reduce Risk Through Innovative and Advanced Technology,” by Scott Patrick Ellisor, Rodrigo Albani Queiroz, and Carlos Eduardo...
Journal Articles
J Pet Technol 72 (10): 49–50.
Paper Number: SPE-1020-0049-JPT
Published: 01 October 2020
...Chris Carpenter This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 30747, “Tripping the Light Fantastic: When Three Become One,” by Euan Murdoch, SPE, Paul Day, and Steven Walduck, Weatherford, prepared for the 2020 Offshore Technology Conference...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30583-MS
... The Lower Tertiary play in the Gulf of Mexico (GoM) was identified and completion approaches were developed in the early 2000s to address the complexities of the formation. The use of single-trip multi-zone completion technology was identified as a cost-effective solution to the stacked pay...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199803-MS
... straddle system was to perform multiple stimulation treatments, ensuring accurate placement in a single trip; thus minimizing intervention time. The system used in the subject well was comprised of mechanical packers with double equalizing valves, a treating port, and a cleanout/debris removal section...

Product(s) added to cart

Close Modal