1-20 of 4343 Search Results for

Tail pipe

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-168005-MS
... is the balanced plug method using drillpipe, tubing, or a combination of both. The pipe is run in the wellbore to the desired depth of the bottom of the plug. A calculated volume of cement is placed in the well. Usually a volume of spacer is pumped ahead and behind the cement. When the plug is in place...
Proceedings Papers

Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, October 24–26, 2011
Paper Number: SPE-148530-MS
... amount of Kinetic energy to the liquid, increasing lift at lower flow rates In addition to that and for more precautionary measures, ESP installed in 5.5" shroud cross-overed to 2 7/8" tail-pipe in order to produce from below perforations to minimize the risk of gas entry to the pump. The total...
Images
Images
Images
Images
Images
Images
Images
Images
Newly designed torque-capable disconnect allows <b>tail</b> <b>pipe</b> rotation while RI...
Published: 25 April 2016
Figure 7 Newly designed torque-capable disconnect allows tail pipe rotation while RIH. Tail pipe rotation enables running operations to be performed more successfully through the most complex wellbores while also improving displacement efficiency of the wellbore during conditioning and cementing More
Images
Images
Images
Images
Images
Images
Rig-up of CT <b>tail</b> <b>pipe</b> and deployment CT: (a) Shear-out connected to the CT...
Published: 22 March 2016
Figure 4 Rig-up of CT tail pipe and deployment CT: (a) Shear-out connected to the CT tail pipe downhole end; (b) CT connector installed at the CT tail pipe uphole end; (c) safety valve installed on top of the CT connector; (d) view of the optical head of the BHA at the end of the deployment CT More
Images
Impact on the liquid production rate in each well where a CT <b>tail</b> <b>pipe</b> was ...
Published: 22 March 2016
Figure 6 Impact on the liquid production rate in each well where a CT tail pipe was installed. More
Images
Impact on the gas production rate in each well where a CT <b>tail</b> <b>pipe</b> was ins...
Published: 22 March 2016
Figure 7 Impact on the gas production rate in each well where a CT tail pipe was installed. More
Images
Images

Product(s) added to cart

Close Modal