1-20 of 8532 Search Results for

Project execution of surface facilities

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181615-MS
...Transfer of high viscous Polymer Mother Solution with minimum viscosity loss - refinement of the pressure drop calculations based on actual experience Abstract This paper is a follow up paper to SPE-169709-MS and discusses key challenges in Surface Facilities Project implementation during...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Gas & Oil Technology Showcase and Conference, March 13–15, 2023
Paper Number: SPE-214279-MS
... engineering Statement of Theory and Definitions Kuwait Energy Egypt has Applied 6 Measures to Achieve Operational Excellence and Cost Optimization during the project execution. Standardization of Engineering and construction of oilfield surface facilities have optimized the engineering design...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208482-MS
...% productive time. Over 47 days on jack-up rig, the team executed 1,227 hours, in this area, achieving the goals of the project and isolating 804 primary reservoirs and 2 intermediate reservoirs, from potential flow to the surface and environment. In achieving this, over 4.19 million feet of slickline...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208621-MS
... riser and pressure control equipment, executing the overburden and surface isolation operations, minimizing online operating time of the jack-up rig. Key Learnings from the pilot project are presented, along with pilot project key performance indicators. The project learning curve, and human...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203139-MS
... an optimum well surface facility program, which will reduce the overall program cost, schedule, and labor risk. Well surface facilities are currently custom designed and constructed (with each design being slightly different), and as a series of projects rather than a single program. The custom design...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193959-MS
... and gas facilities (including wells) normal life cycle. Although oil and gas capital development project planning and execution experience are abundant, planning and execution for field abandonment is new, especially for subsea in this region. The lack of experience provided a unique opportunity...
Proceedings Papers

Paper presented at the SPE Symposium: Production Enhancement and Cost Optimisation, November 7–8, 2017
Paper Number: SPE-189261-MS
... the facilities Hook Up and Commissiong (HUC) and construction scope. EOR campaign is executed by a Hook-Up and Commissioning contractor under EPCC lump sum mode. Synergizing the the EPCC contract gave significant cost savings for the project. For surface scope, team managed to save almost 70% cost by combining...
Proceedings Papers

Paper presented at the SPE Kuwait Oil & Gas Show and Conference, October 13–16, 2019
Paper Number: SPE-198135-MS
... guidance for conducting the planning, development, and execution activities over the life cycle of surface facilities capital projects. Implementation of the PGS Process will ensure continued alignment of the capital projects with KOC’s strategic, financial, operational on HSE requirements...
Proceedings Papers

Paper presented at the SPE International Heavy Oil Conference and Exhibition, December 10–12, 2018
Paper Number: SPE-193671-MS
... oil project with 94 activities organized in 7 field life cycle phases: 1) Data acquisition for uncertainty reduction, 2) static modeling, 3) dynamic modeling, 4) field development planning, 5) well and facilities engineering, 6) execution and 7) operations and monitoring. Each phase undergoes...
Proceedings Papers

Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 4–6, 2015
Paper Number: SPE-178307-MS
... data quality improvement initiative project operation maintenance activity society of petroleum engineers quality reliability data integrity business improvement initiative project surface production facility reliability information management equipment failure history reliability data...
Proceedings Papers

Paper presented at the Offshore Technology Conference Asia, November 2–6, 2020
Paper Number: OTC-30343-MS
... explained in this paper. Stage Gate 1:To get the project prepared in order to realize pilot injection scheme Stage Gate 2:To get the project to select the most optimum pilot facility concept Stage Gate 3:To define the selected pilot facility concept for execution Scope of Pilot Program...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 1–4, 2010
Paper Number: SPE-137563-MS
... Plant Challenges Abstract The Facilities Modernization Projects (A & B) are part of Kuwait Oil Company’s strategic development plan to meet and achieve its production objectives and targets by adding and upgrading surface production facilities along with relocation of underground piping...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203071-MS
... production early in the project by commissioning partial facilities instead of waiting completion of complete scope. To overcome the delays in execution of complete EPC scope (case-I), then PMT with help of its sub-surface team developed the first oil production scenario (refer Fig-3 ) with breaking down...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, March 25–28, 2001
Paper Number: SPE-69656-MS
... environment of the present Project. The structure of a GIS, this of Surface Facilities or other, must execute certain premises so as users can obtain easily the information from their terminals, will be not aspects of the facilities without analyzing and the beginning fixed limits do not stop...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2000
Paper Number: OTC-11870-MS
.... ExxonMobil Acreage in West Africa OTC 11970 EXECUTION OF OFFSHORE PROJECTS: WEST COAST OF AFRICA 5 Figure 2. Applicable Deepwater West Africa Development Technologies Subsea Systems Surface Concepts (Dry Tree and Wet Tree) Reservoir Description and Depletion Planning Drilling and Completions 6 ROBERT J...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183359-MS
... concerns about the impact of compositional and volumetric variations on designing the optimum facilities to suit the reservoir data whilst retaining maximum project value. IAM therefore provides greater design certainty and engineering definition prior to execute. These benefits can be achieved...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210902-MS
... drilling. Close coordination's between subsurface, drilling and project teams were the key in optimizing surface well locations to minimize the impact of the EPZ (Emergency Planning Zone) on existing sweet facilities. Yibal Khuff project is a mixed oil-rims, associated gas and non-associated gas...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186944-MS
... Oil & Gas tepi surface engineering team strategic planning and management project design execution surface engineering team project management design intent minimalist concept gathering facility society of petroleum engineers base case safety mindset installation philosophy site...
Proceedings Papers

Paper presented at the North Africa Technical Conference and Exhibition, February 20–22, 2012
Paper Number: SPE-149853-MS
... injectors and monitors) and surface facilities (both injection and production) made the project was not feasible compare to the reserve. Since adding new wells and surface facillities became obstacle, the only way to get the project running was using existing wells and facilities. Thus, the development...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197240-MS
...) Multiple trajectory optimization iterations were completed achieving a reduction of more than 10% of the initial expected Drillex (Drilling Capex) Based on the schedule planned and well delivery timeline, the surface facilities readiness was validated Due to the time saved during the project...

Product(s) added to cart

Close Modal