1-20 of 2365 Search Results for

Progressing Cavity Pumping Systems

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Canadian International Petroleum Conference, June 11–13, 2002
Paper Number: PETSOC-2002-091
... Abstract A Group of manufacturers of surface drives for progressing cavity pumping (PCP) systems has supported the development of an industry standard for such equipment. The purpose of the standard is to provide guidelines for designing, specifying and using surface drives and to ensure...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition - Americas, November 10–12, 2020
Paper Number: SPE-201146-MS
... Abstract The progressive cavity pumps system (PCP) are very successful in Colombian oil fields, however, wells operated under severely deviated conditions such as abrupt changes in deviation, high dogleg severity (3-6°/100 ft), and/or inclination angles up to 60° have generated between 3 and 5...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, January 13–15, 2020
Paper Number: IPTC-19774-Abstract
... This paper explains the benefits of using Progressing Cavity Pump (PCP) as a reliable Artificial Lift System (ALS) to be deployed during short term drill stem testing (DST) operations in mid to shallow heavy oil wells in Kingdom of Saudi Arabia. A screening of the available ALS's...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-193270-MS
... Abstract Progressing cavity pump (PCP) systems are widely used in the oil and gas industry. Continuously evaluating PCP performance helps to maximize and sustain fluid production and increase pump run-life. This paper focuses on integrating a real-time platform and advanced software to model...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference — Latin America and Caribbean, May 27–28, 2015
Paper Number: SPE-173947-MS
..., it presents useful and referential information for selecting technologies that eliminate or control the backspin effect in PCP systems. artificial lift system Colombia fluid column PCP system innovative technology progressing cavity pump information power cut backspin elimination Upstream Oil...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference-Americas, May 21–22, 2013
Paper Number: SPE-165075-MS
... Abstract This paper describes the physical principles behind the backspin generated by stopping progressing cavity pumping systems (PCP). After describing each and every one of them, action items are recommended to help operators to mitigate risks and potential safety hazards, based...
Proceedings Papers

Paper presented at the SPE Mid-Continent Operations Symposium, March 28–31, 1999
Paper Number: SPE-52162-MS
... model progressing cavity pump artificial lift system rod string spe 52162 control action artificial intelligence well optimization package progressive cavity operation reduction upstream oil & gas Copyright 1999, Society of Petroleum Engineers Inc. This paper was prepared...
Proceedings Papers

Paper presented at the SPE International Heavy Oil Symposium, June 19–21, 1995
Paper Number: SPE-30271-MS
... Abstract Heavy oil and bitumen wells were traditionally produced with beam pumping systems. However, in the early 1980's, the introduction of progressing cavity (PC) pumping systems presented an alternative to beam pumps that possessed attributes which were ideally suited for heavy oil...
Journal Articles
J Can Pet Technol 27 (01).
Paper Number: PETSOC-88-01-05
Published: 01 January 1988
... and associated operating techniques by both the producing and service companies involved, economic development has been made possible. This paper will describe the evolution a/the progressive cavity pump system in the development of the Clearwater Formation in the Lindbergh-Elk Point field. Modifications made 10...
Images
Images
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 23–April 1, 2021
Paper Number: IPTC-21827-MS
... the presence of sand is an extra challenge for almost all the artificial lift method, despite there are a considerable Rod Lift well count, the progressive cavity pump systems (PCP) is consider the best option for this type of wells. Despite the favorable well conditions on Señal Picada and Punta Barda fields...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 1–4, 2000
Paper Number: SPE-63048-MS
... Abstract This paper describes an intelligent system for the management and control of petroleum wells operating with progressing cavity pumps (PCP), named CONTROL: PCP. The purpose of CONTROL: PCP is to maintain the operational conditions of PCPs within the established limits, reduce...
Proceedings Papers

Paper presented at the Latin American and Caribbean Petroleum Engineering Conference, April 21–23, 1999
Paper Number: SPE-53962-MS
... completion needed to perform such a task are discussed as well, including the axial load measuring device. The benefits of operating a PCP system using a Progressive Cavity Pump Optimization System (PCPOS) are substantial, as described in this paper. The idea is to reduce downtime, workovers, improve system...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition - Americas, November 10–12, 2020
Paper Number: SPE-201131-MS
... e * %   w e i g h t Figure 3 Ranking Rod Tool Abstract Rod Pumping and Progressive Cavity Pumping Artificial Lift Systems have sucker rods as one of their main components exposed to failure. Given the different available brands, metallurgies and even conventional...
Proceedings Papers

Paper presented at the SPE Kuwait Oil & Gas Show and Conference, October 15–18, 2017
Paper Number: SPE-187552-MS
... the failure of the existing progressive cavity pump (PCP). The subject well had a PCP at 4,248.05 ft. setting depth failed after 60 days due to a broken rotor. Attempts to fish the parted rotor were unsuccessful. To avoid a workover rig and to reduce non-productive time (NPT), a SRP system with an insert...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-206228-MS
... located in Indonesia required rigless installation of an insertable progressive cavity pump (I-PCP) as a cost-effective solution to restore production while eliminating the need to retrieve the upper completion for extensive maintenance. The well had been previously completed with a conventional...
Proceedings Papers

Paper presented at the SPE Russian Petroleum Technology Conference, October 26–29, 2020
Paper Number: SPE-201887-MS
... A motor which can optimally meet the requirements of the submersible drive of the electric progressive cavity pumps is a submersible low-speed electric motor elaborated by LLC System-Service MC (hereinafter referred to as the EMSS) An electric progressive cavity pump with an EMSS has...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192043-MS
... progressing cavity pump zonal isolation anchor system enable rigless installation Completion Installation and Operations mechanism inflatable packer i-pcp sucker rod inflatable packer anchor system enable stator operation Upstream Oil & Gas BHA shearable intake sub integrity sequence...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185380-MS
... Abstract This paper provides the design and operating considerations for Progressive Cavity Pumping (PCP) systems in Coal Bed Methane (CBM) wells based on field experience and illustrates their optimization with case studies of C-Fer software simulation and field trial. The challenge...

Product(s) added to cart

Close Modal