Skip Nav Destination
Close Modal
Search Results for
Millout extension
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Journal
Publisher
Conference Series
Date
Availability
1-20 of 68 Search Results for
Millout extension
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference, February 21–23, 2006
Paper Number: SPE-99138-MS
... with millout extensions or blank bottoms. Today, however, packers are being run with seal bore extensions instead of millout extensions. Packers are being manufactured with more exotic materials and high chrome metals. These materials present a milling challenge -- not only do they create longer milling times...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, March 26–28, 2013
Paper Number: IPTC-16853-Abstract
... of leaving plugs in the well for an extended time period was to remove fluids from the formation faster, avoiding time required to complete the coiled tubing millout and also to understand well productivity earlier. It was found that there was more extensive case history of operators leaving a minimal amount...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Hydraulic Fracturing Technology Conference and Exhibition, May 4–6, 2021
Paper Number: SPE-204202-MS
... resulting in extensive non-productive time or unplanned wellbore remediation. As lateral lengths progressed across shale basins throughout the Lower-48, HCU technology saw increased opportunity to establish itself in the frac plug millout space. Since that time, HCUs have been utilized across multiple...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Europec featured at 79th EAGE Conference and Exhibition, June 12–15, 2017
Paper Number: SPE-185819-MS
... of time. On all the pads, the wells completed using uncemented multistage completion systems had lower CAPEX Quicker completions and easier millouts helped contribute to the lower upfront CAPEX. The uncemented multistage wells also flowed back initially at higher rates. This paper compares a new...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE North Africa Technical Conference and Exhibition, September 14–16, 2015
Paper Number: SPE-175820-MS
..., including high DLS. During the application of this technique, CT interventions are primarily considered in the event of contingencies, such as screenouts (sand cleanout) and plugs prematurely setting (plug millouts). Even though no completion operation is immune to contingencies and associated costs...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Eastern Regional Meeting, October 31–November 2, 1984
Paper Number: SPE-13372-MS
... firing head, 26 ft. (7.9m) of pup joints, one-way flow valve with glass disc to protect firing head from debris, packer millout extension, retrievable hydraulic seal bore packer, and anchored seal assembly with production tube. 2. 3. 4. 5. 6. Run bottom hole assembly and production tubing and accessories...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the European Petroleum Conference, October 20–22, 1986
Paper Number: SPE-15887-MS
... pressure and temperature guages and redirect flow into the tailpipe higher up. c. The ability to guide the exit from and retrieval into the tubing string of wireline tools. d. The provision of seal bore and millout extensions as necessary. The overall approach to tailpipe assembly design is depicted...
Proceedings Papers
Vaca Muerta Coiled Tubing Operations Success and the Development of Future Extended Reach Operations
I. I. Galvan, M. M. Nebiolo, R. D. Del Negro, G. A. Landinez Gomez, C.. Cerne, A.. Sanchez, G.. Mallanao
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 21–22, 2017
Paper Number: SPE-184752-MS
... was brought in to safely and effectively perform plug millouts and well cleanouts after multistage fracturing operations. Initially, 2 inch CT strings with a simple wall taper shape were an effective and reliable option to complete wells in the initial development stage. However, the need for optimized...
Journal Articles
Journal:
Journal of Petroleum Technology
Publisher: Society of Petroleum Engineers (SPE)
J Pet Technol 37 (08): 1491–1497.
Paper Number: SPE-12424-PA
Published: 01 August 1985
... PBR SHORT TOW SEAL ~-J\ STUCl< LOWER SEAL 8'8/8" (21.8 c .. ' CASING -OPEN HOLE 9-8/8" (24.8c .. ' CASING -7"07.8c .. ' TUBING 7:I-LOCATOR SUB '- SEAL ASSEM8LY RETRV. peR - ANCHOR SEAL ASSY, PROD. PACKER -MILlOUT EXT. - SEATING NIPPLE - -TOPOf 7"07.8c .. ' fiSH WIRE LINE ENTRY GUIDE -P8R -7" 07.8 c...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199843-MS
... for use in unconventional resource developments where CT is subjected to extreme well lateral lengths. CASE HISTORY 2.375-in CT Engineered Solution for plug millout and cleanout operations in super lateral wells. Well completions diagrams, surveys, operational practices and CT surface equipment...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Oklahoma City Oil and Gas Symposium, March 27–31, 2017
Paper Number: SPE-185107-MS
... Abstract Research and development of hydraulic fracturing plug materials has shifted to materials that degrade upon exposure to wellbore fluids, thus eliminating the typically necessary post-fracturing millout operations. This paper provides an overview of the field trials and initial...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173695-MS
...&P operations, and they bring an extra level of difficulty when it comes to the applicability of the technique. Millouts and cleanouts with coiled tubing (CT) have for many years been the preferred method to remove frac plugs after stimulation when using the P&P technique. The simplicity...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17668-MS
... Packer, size 200-133. 253 N U"1 ,J EIETRIEVABLE HOOKWALL NIRELINE CONVEYED FIRING HEAD l..tttiH-- OUAD TRANSFER BLOCK OUAD 5 PERFORATING SUNS - 20 SC-iL PACKER RIH N/PERFORATIN6 HOOK-UP Fig. 3 SequenuaJ hookup of 1ystem. PERFORATING W/WIRELINE CONVEYED FIRING HEAD 20 SC-iL PACKER ts MILLOUT...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 22 (02): 231–235.
Paper Number: SPE-98119-PA
Published: 19 May 2007
... damaged packing elements in the seal assembly. Cement was ruled out because of low placement accuracy and the fact that a millout would need to be performed when the tubing was changed out. The OCP system as an annular barrier was chosen as the best alternative. Once again, a temporary gel plug...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Conference & Exhibition, April 4–5, 2006
Paper Number: SPE-100139-MS
... of deployment and millout of current plug designs that were being used in the field. Thorough research revealed that several design changes could be employed to increase the reliability of composite frac plug deployment and decrease the time needed to remove the plug and put the well on production...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 5–7, 2014
Paper Number: SPE-172376-MS
... NU box, 4” Blank Pipe, 7ft 11.6ppf L80 8rd NU, MMS Screens 4” 180micron 20ft 8rd NU, 4” Blank Pipe 20ft & 7ft, MMS Screens 4” 180micron 2 Jts 20ft, 4” Blank Pipe 2Jts 20ft, Crossover, Millout Extension, 9-5/8” × 6.000 SealBore Packer. The BHA was run to depth on 3-1/2” Drill Pipe to bottom...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 22–25, 1995
Paper Number: SPE-30648-MS
... Assembly "SC-2PAH" Packer Liner Hanger 7" Liner Figure 6 - PSI SYSTEM After all zones are stimulated, run final production packer with millout extension, tail pipe and L.T.S.A. Land L.T.S.A. in top of hydraulic set retrievable packer and pressure up tubing to set upper most packer. R.I.H. with coiled...
Journal Articles
Journal:
Journal of Petroleum Technology
Publisher: Society of Petroleum Engineers (SPE)
J Pet Technol 34 (09): 2113–2124.
Paper Number: SPE-10078-PA
Published: 01 September 1982
... TUBING 244.5mm (9s L-BO INTERMEDIATE CASING 17Bmm (7") SOO-90 AND L-BO PRODUCTION CASING SLIDING SLEEVE LOCATOR SEAL ASSEMBLY PERMANENT PRODUCTION PACKER JL-"l __ -SEAL BORE EXTENSION MILLOUT SUB SElECTIVE LANDING NIPPLE NO GO LANDING NIPPLE 127mm (5") L-BO PRODUCTION LINER Fig. 2-Typical deep sour gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14004-MS
... SEAL PACKER MILLOUT EXTENSION 41 FLOW COUPLING LANDING NIPPLE SOLENOID VALVE COMPLETION FIG. 4 Wireline Retrievable Solenoid Valve and Landing Nipple Lock Landing Nipple Equalizing Sub (optional) Closing Spring Armature Coil Flow tube Seat Flapper SPE 1 4 00 4 FIG. 5 1985. Society of Petroleum...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–23, 2022
Paper Number: SPE-209021-MS
... OF LARGER DIAMETER 2.625-IN CT ENGINEERED SOLUTION FOR PLUG MILLOUT AND CLEANOUT OPERATIONS IN PERMIAN SUPER-LATERAL WELLS PRE-JOB ANALYSIS To maximize the efficiency of the operations on these super lateral Permian wells, information from the well operator, service company and CT manufacturer...
1
Advertisement