Skip Nav Destination
Close Modal
Search Results for
MLT
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Journal
Publisher
Conference Series
Date
Availability
1-20 of 640 Search Results for
MLT
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211573-MS
... Abstract This paper highlights the successful installation of a MultiLateral Technology (MLT) for the first time in an offshore field 40 km from Abu Dhabi. It will document the deployment of the deepest cemented MLT Level 5 globally, with improvements in well design and operations sequence...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 17–19, 2017
Paper Number: SPE-185536-MS
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145675-MS
... was set at 6250 m MD. 12 ¼″ × 14″ T1 section 12 ¼″ × 14″ sidetrack was performed to TD at 6960 m MD. The 9 5/8″ × 10 ¾″ MLT liner with pre-cut aluminium window was made up and run with an inner string. The liner got stuck at 6310 m MD. After several attempts to cut and pull liner it liner...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Middle East Oil and Gas Show and Conference, March 15–18, 2009
Paper Number: SPE-119675-MS
... in the range of 30% to 50% 6 . Combined Rotary-jetting and MLT Based on the advantages of the MLT and rotary-jetting systems, it was required to combine and run both systems in a single trip to meet the treatment objectives for this particular case. Previously, these systems could not be combined...
Images
in A Proposed Design of Multi-Lateral Wells Technology Application in Block 15-Red Sea Offshore SUDAN
Published: 20 February 2012
Figure (13) MLT Technology Guide Software result for Tokar-1 MLT Application More
Images
Published: 26 October 2010
Figure 6 Dependence of MLT relative efficiency on permeability and net pay for MLT 45° and 90°. More
Images
Published: 01 September 1993
Figure 2 MLT test with sequential pressure and flow rate measurements. More
Images
Published: 01 September 1993
Figure 10 Comparison of derivative responses for simulated isolated zone, MLT, and CSLT tests. More
Images
in A Proposed Design of Multi-Lateral Wells Technology Application in Block 15-Red Sea Offshore SUDAN
Published: 20 February 2012
Figure (9) The final completion design of Tokar-1 MLT well More
Images
Published: 28 October 2013
Figure 2 MLT BHA schematic More
Images
Published: 28 October 2013
Figure 3 Multilateral Tool (MLT) operation sequence (1. running across junction, 2. indexing, 3. finding lateral, 4. accessing lateral) More
Images
Published: 11 June 2012
Figure 8 G&G suggested shale zone for MLT Junction Placing More
Images
Published: 08 April 2003
Fig. 3 Discovery MLT BHA More
Images
Published: 15 April 2007
Fig. 7 Planning trajectories for well MLT-1. More
Images
Published: 15 April 2007
Fig. 8 Drilling project for well MLT-1. More
Images
Published: 12 September 2005
Figure 7 Installation sequence - Gullfaks dual MLT installation More
Images
Published: 12 September 2005
Figure 7 Installation sequence - Gullfaks dual MLT installation More
Images
Published: 07 April 2009
Fig. 6 MLT liner run More
Images
Published: 15 March 2009
Figure-2 Schematic of MLT More
Images
Published: 15 March 2009
Figure-3 MLT Function Principle More
1
Advertisement