1-20 of 129 Search Results for

MDRT

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Images
Images
Optimised Test at 22,142 ft <span class="search-highlight">MDRT</span> at 18:36 hrs with Mobility of 4.2 mD&#x2F;cP wi...
Published: 02 March 2004
Figure 10a & 10b Optimised Test at 22,142 ft MDRT at 18:36 hrs with Mobility of 4.2 mD/cP with two different pressure scales. More
Images
Optimised Test at 22,142 ft <span class="search-highlight">MDRT</span> at 20:08 hrs with Mobility of 4.6 mD&#x2F;cPwit...
Published: 02 March 2004
Figure 11a & 11b Optimised Test at 22,142 ft MDRT at 20:08 hrs with Mobility of 4.6 mD/cPwith two different pressure scales. More
Images
Optimised Test at 9,328 ft <span class="search-highlight">MDRT</span> at 6:51 hours with Mobility of 2.5 mD&#x2F;cP
Published: 02 March 2004
Fig. 12 Optimised Test at 9,328 ft MDRT at 6:51 hours with Mobility of 2.5 mD/cP More
Images
Basic Test at 9,328 ft <span class="search-highlight">MDRT</span> at 7:04 hours with Mobility of 1.3 mD&#x2F;cP
Published: 02 March 2004
Fig. 13 Basic Test at 9,328 ft MDRT at 7:04 hours with Mobility of 1.3 mD/cP More
Images
Images
Typical LWD Formation Pressure Test at 6694m <span class="search-highlight">MDRT</span> (black = block-height, bl...
Published: 26 September 2004
Figure 6 Typical LWD Formation Pressure Test at 6694m MDRT (black = block-height, blue = standpipe pressure); the time stationary was 4 minutes, only (02:42 – 02:46). More
Journal Articles
J Pet Technol 61 (11): 55–56.
Paper Number: SPE-1109-0055-JPT
Published: 01 November 2009
... for both the longest well, at 40,320 ft measured depth from the rotary table (MDRT), and the longest along-hole departure of 37,956 ft. The use of new techniques allowed existing constraints to be challenged and overcome successfully. These achievements were possible by applying sound engineering...
Proceedings Papers

Paper presented at the SPE/AAPG Africa Energy and Technology Conference, December 5–7, 2016
Paper Number: SPE-AFRC-2571371-MS
... prior to mobilization, where multiple shifts were successfully executed on a 90° deviated pipe using a single set of shifting key pads. Test results were then repeated offshore, completing two interventions in a single run. The SSD's were successfully opened at ~12,000 ft MDRT and ~8,000 ft MDRT...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192104-MS
... 11.0 to 11.28 lbm/gal. The measured depth (MD) of these wells was more than 4500 m (MDRT). Mud weights ranged from 10.9 to 11 lbm/gal in the well while drilling the zone. The length of the liner normally ranged from 1400 to 2300 m. The cement slurry was finalized after conducting numerous tests...
Proceedings Papers

Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 6–8, 2018
Paper Number: SPE-193490-MS
... Plug 1b: Cement plug 1b was set as a remedial plug to plug 1a. It was planned to be set from 7229ft – 6589ft MDRT, however after plug placement operations the cement was tagged with 10klbs shallower at 6832ft MDRT (243ft deeper). It was pressure tested successfully to 1500psi. Plug 5: Cement...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, January 19–22, 2014
Paper Number: IPTC-17611-MS
...-drilled liners with open hole isolation packers were installed from the production casing shoe to TD (~6,800 ft to ~29,300 ft MDRT, ~3,450 ft TVDRT at 90° inclination) in multiple runs. The completion was installed to facilitate selective control of each of the 3 zones using surface controlled valves...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, December 7–9, 2009
Paper Number: IPTC-13330-MS
... was further extended when a producer was drilled to a world-record depth of 40,320 ft MDRT. As the result of the application of extended reach horizontal wells, Al Shaheen is at present developed from only nine platform locations; for comparison in excess of 40 locations would have been necessary...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 17–19, 2009
Paper Number: SPE-119506-MS
... length of 35,770 feet. This well also set new world records for both the longest well at 40,320 feet MDRT and the longest along hole departure of 37,956 feet. The introduction of new techniques has allowed existing constraints to be successfully challenged and overcome. This was achieved through...
Proceedings Papers

Paper presented at the IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition, November 1–3, 2010
Paper Number: SPE-135670-MS
... openhole packer 3-zone completion al shaheen field mdrt reservoir deployment stimulation straddle pre-drilled liner packer well integrity floatation requirement drilling operation control line zonal isolation reservoir section Introduction Maersk Oil Qatar entered into a Production...
Images
Architecture of the candidate well with the casing sizes and sections of in...
Published: 15 December 2021
Fig. 1 Architecture of the candidate well with the casing sizes and sections of interest highlighted in yellow before drilling. The salt formation is shown in pink in the center of the image. TD = total depth; MDRT = measured depth rotary table; TVDRT = true vertical depth; CP = conductor pipe; MD... More
Journal Articles
Journal Articles
SPE Drill & Compl 28 (04): 370–390.
Paper Number: SPE-166166-PA
Published: 18 December 2013
... an exterior slot. Surface casing: 13⅜-in. 68-lbm/ft N80 is set at ± 340-m measured depth rotary table (MDRT) into the Withnell formation (just through the differentiated Tertiary) to obtain a competent shoe. Intermediate casing: 9⅝-in. 47-lbm/ft L80 premium connection is set horizontally at ± 1600...
Images

Product(s) added to cart

Close Modal