1-20 of 1274 Search Results for

Gas blowout after abandonment

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207834-MS
..., all equipment was cleared away and this contributed to proceeding to permanent abandonment immediately after the relief well success. Finally, the adverse effect of the blowout on the environment (HSE) was qualitatively discussed. operational safety explosion incident well control upstream...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208461-MS
... of the operations. Therefore, a temporary abandonment operation was planned to mitigate the leakage problem in the primary and secondary seals, during which the well started flowing gas profusely after nipple-down of the blowout preventer. The shortcomings of the abandonment process can be conquered...
Proceedings Papers

Paper presented at the OTC Brasil, October 27–29, 2015
Paper Number: OTC-26245-MS
...OTC-26245-MS Ultra-Deepwater Blowout Well Control and Abandonment Operations Through Relief Well Under Capping and Containment Scenario After Worst Case Discharge F. Terra, A. Lage, and T. Yoiti, Petrobras; Z. Yuan, and D. Bueno, Schlumberger Copyright 2015, Offshore Technology Conference...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, December 7–9, 2009
Paper Number: IPTC-13434-MS
..., in addition, gas and water flowed from 30" conductor pipe of A-11-17 to lower deck up to 8 meters height. Underground blowout was controlled by engineering planning with no fire after 60 days. It was designed base on three main concepts: Surface blowout control to allow continues work safely on the platform...
Proceedings Papers

Paper presented at the SPE Russian Petroleum Technology Conference, October 12–15, 2021
Paper Number: SPE-206602-MS
... while drilling operations were underway and Baghjan Well 5 was producing 3.5 MMSCFD of gas until extremely high-pressured gas flow to the surface led to a blowout. Spewing gas from Pasarlapudi well caught fire immediately after the blowout. Flame intensity was so high that it was visible from a distance...
Proceedings Papers

Paper presented at the Nigeria Annual International Conference and Exhibition, August 1–3, 2005
Paper Number: SPE-98793-MS
..., plus good teamwork, provided the necessary ingredients to divert the gas fire and gain access to the wellhead thus enabling killing, securing and partial abandonment of the well. . Introduction After a blowout, everyone wants to find the cause, prevent recurrence and understand how it was controlled...
Journal Articles
J Pet Technol 48 (05): 398–405.
Paper Number: SPE-29249-JPT
Published: 01 May 1996
... that the 4 3/4-in. motor was in heavy-walled, 7-in. casing and could act as a choke. Also, drilling was resumed after about 24 hours while the well was blowing to deepen the hole into the pocket and get all remaining gas. Underground Blowouts. This type of application is ideal for coiled tubing. The pipe can...
Journal Articles
J Pet Technol 67 (01): 100.
Paper Number: SPE-0115-0100-JPT
Published: 01 January 2015
... cementing operations. These occurrences have been experienced by the petroleum industry worldwide and can happen at any moment of the well life cycle, from the drilling phase to abandonment after the well’s production life. Here, I have categorized these well-integrity issues according to the moment...
Proceedings Papers

Paper presented at the Middle East Oil Show, March 11–14, 1995
Paper Number: SPE-29859-MS
... because of excessive gas encountered in the charged shallow water aquifer. The only remaining option was to drill a·relief well to control the blowout. PRE-PLANNING Relief Well 515 was to be drilled to kill the blowout flow in Well 159, plug and abandon Well 159, and then serve as a replacement well...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 27–30, 1987
Paper Number: SPE-16677-MS
.... Escaping gas ignited. Control of the well was lost and the kick unloaded the well and turned into a blowout. Estimated flow was 7,000 b/d (1,112 m3/d) of 38 degrees API crude and 40 MMcfd (1.13 × 10-6 M3/d) of natural gas. The crew abandoned the rig quickly without incident and backed off the tender...
Journal Articles
J Pet Technol 60 (04): 60–62.
Paper Number: SPE-0408-0060-JPT
Published: 01 April 2008
.... After 3 weeks, the loop current abated, and a remotely operated vehicle (ROV) could be deployed. Upon deployment, it was discovered that the development well was blowing out, with the blowout plume carrying more than 300 ft. Introduction The prospect was drilled initially in 1997 and abandoned...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10896-MS
.... These gravel packs may extend only a few feet or hundreds of feet down wellbores and through producing intervals. Although they improve pro- duction and extend the lives of many wells, gravel packs seri- ously challenge plug-and-abandon operations. Even after a well has been plugged with a conventional- grind...
Journal Articles
J Pet Technol 30 (05): 705–711.
Paper Number: SPE-6835-PA
Published: 01 May 1978
... at 1,310 ft. The kick control effort was terminated and the rig abandoned when gas broke around the 20-in. shoe and bubbled up under the platform. Eight days after the blowout, the gas ignited and in 2 weeks the rig and platform disappeared beneath the Arabian Gulf. The Asmari limestone formation...
Proceedings Papers

Paper presented at the SPE International Production and Operations Conference & Exhibition, May 14–16, 2012
Paper Number: SPE-156119-MS
... operations and until the blowout well was killed and abandoned. Shallow Gas The underground flow of reservoir fluids was expected to charge the shallow UER formation with gas associated with H 2 S. The issue was mitigated by drilling the 17 ½ inch hole section using a rotating head. Nahr Umr Shale...
Proceedings Papers

Paper presented at the IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition, November 13–15, 2006
Paper Number: SPE-102039-MS
... crew was safely evacuated. After the initial blowout incident the well flowed up the annulus for 4 days before the remotely operated vehicle (ROV) activated closure of the lower pipe variable bore rams (VBR) on the seabed ( Fig. 1 ). Flow of dry gas and formation continued intermittently up...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29461-MS
... in the pipe is very large at early time and then plateaus (Figure 3). In Figure 4 we show the blowout flow rates for each of the three phases over time. The overall leakage is dominated by gas-like CO2 after a short period (~0.1 hour) of two-phase CO2 (gas and liquid) conditions, the liquid CO2 arising from...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-167970-MS
... Abstract This paper examines engineering and operating activities during post-discovery temporary abandonment of the Macondo exploration well that led to and caused the 20 April 2010 blowout and oil spill in the Gulf of Mexico. The paper ignores finger pointing and hearsay evidence and focuses...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 28–March 3, 1989
Paper Number: SPE-18717-MS
... programming are discussed in detail along with the attendent problem areas. problem areas. Synopsis of the Blowout Directional well 7-N-19D-RJS, located in the Campos Basin offshore southwestern Brazil, was producing oil from the Macae formation. The well was to be worked over to produce gas from...
Journal Articles
J Pet Technol 63 (01): 70.
Paper Number: SPE-0111-0070-JPT
Published: 01 January 2011
... operations and even after the well is plugged and abandoned. Serious well-control incidents can occur any time after the well is spud in, even when least expected. Two recent incidents in the Gulf of Mexico remind us of this fact. The first that I will mention is the BP Macondo blowout. Because this incident...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 15–18, 1994
Paper Number: SPE-27502-MS
... was detected by the gas monitoring system. ~he rig was abandoned. The well ignited after blowing up the casing annulus for 11 1/2 hrs. A gas boil was reported on the water 21 hours after the well started blowing. The flow must have eroded the formation behind the 16 in. (406 mm) pipe and started flowing...