1-20 of 97 Search Results for

FSV

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the 55th U.S. Rock Mechanics/Geomechanics Symposium, June 18–25, 2021
Paper Number: ARMA-2021-1579
... ABSTRACT: Fracture network swept volume (FSV) is an effective means to directly evaluate the fracturing effect of multi-fractured horizontal wells (MFHWs). In the paper, first, the multi-level evaluation system was established by using the analytic hierarchy process (AHP) to describe...
Proceedings Papers

Paper presented at the 18th World Petroleum Congress, September 25–29, 2005
Paper Number: WPC-18-1029
Proceedings Papers

Paper presented at the IADC/SPE International Drilling Conference and Exhibition, March 3–5, 2020
Paper Number: SPE-199549-MS
... in the campaign. Deployment and Installation of the Tubing Head Spool (THS) prior to running the new technology Single Trip Completion. Previously, a Field Service Vessel (FSV) was used for this operation but this has been eliminated. This operation has also been performed more efficiently on the rig saving ca...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207370-MS
... plant on a supply vessel from operator fleet (multi-purpose FSV – field support vessel) was the most cost-efficient approach to address the high volumes required as there was no Well Stimulation Vessel (WSV) available "on call" in the Brazilian offshore market at that time. This solution could also...
Proceedings Papers

Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 11–13, 2020
Paper Number: SPE-203775-MS
... Figure 3 Rig Stack configuration This stage involves the displacement of half of the 11.4 ppg fluid in the string into the riser using 9.7 ppg SBM, it was achieved through closing the choke line middle FSVs and having the PR #2 (5" X 7" VBR) opened ( Figure 7 ). 160 bbls (half the drill...
Journal Articles
SPE Advanced Technology Series 3 (01): 60–65.
Paper Number: SPE-26471-PA
Published: 01 March 1995
..., then the longitudinal relaxation rate constant T1 is defined by (1) where T1 is the rate constant for longitudinal relaxation, Fsv is the surface area to volume ratio of the pore space and is the surface relaxivity. Pore size information is determined from the length parameter, Fsv, under conditions of known. 1 3...
Proceedings Papers

Paper presented at the SNAME Maritime Convention and 5th World Maritime Technology Conference, November 4–6, 2015
Paper Number: SNAME-WMTC-2015-158
... hull numerical investigation fsv computation kvlcc2 production monitoring reservoir simulation inception separation line instability grid lpp 0 fresco turbulence model Experimental and Numerical Investigations on Flow Characteristics of the KVLCC2 at 30° Drift Angle Moustafa Abdel...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 7–10, 1990
Paper Number: OTC-6259-MS
... support at the seafloor. The Field Support Vessel (FSV) Stena Wellservicer is equipped with a 130 ton twin crane. The hydraulic crane is controlled by a computerized Crane Control System including Manual, Active Heave Compensation and Constant Tension modes on all winches. Using well-equipped dynamic...
Proceedings Papers

Paper presented at the Submersible Technology: Adapting to Change: Proceedings of an international conference ('SUBTECH' 87- Adapting to Change), November 10–12, 1987
Paper Number: SUT-AUTOE-v14-299
... platforms or have sufficient endurance to depart from their home base using on-board, long-endurance power sources The type of surface platform used to support subsea field production has a major impact on field economics The most sophisticated field-support vessels (FSVs) may cost four to six times the day...
Journal Articles
Int. J. Offshore Polar Eng. 18 (04).
Paper Number: ISOPE-08-18-4-302
Published: 01 December 2008
... ) of streamwise vibrations usually exist: First Streamwise Vibration (FSV) and Second Streamwise Vibration (SSV). In the SSV stage, the vortex shedding frequency may either undergo a jump to that of the streamwise vibration, or stay consistent with that of the transverse vibration. The amplitudes of transverse...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 3, 2001
Paper Number: SPE-71676-MS
... lift to obtain economic production rates. There are other features of the completion, notably the formation saver valve (FSV), which allows the ESP to be worked over without excessive fluid loss to the formation. hydraulic isolation tool hydraulic oil reservoir surveillance downhole sensor...
Journal Articles
SPE Drill & Compl 15 (01): 7–13.
Paper Number: SPE-62041-PA
Published: 01 March 2000
... to replace the ESP, especially when used in conjunction with a formation saver valve (FSV). Coiled tubing equipment is not needed and, therefore, completions of M-11's length become possible. Coiled tubing intervention is not a practical proposition at these depths with the current technology. Fig. 4...
Proceedings Papers

Paper presented at the SNAME Maritime Convention, November 4–6, 2010
Paper Number: SNAME-SMC-2010-PAN03
.... For example, in 1992, Protected Resources (Endangered Species Act, Marine Congress authorized an extensive 15-year program to replace Mammal Protection Act) and modernize NOAA s entire fleet. However, only four Habitat (Conservation, Protection, Restoration) Fisheries Survey Vessels (FSVs) and one Coastal...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-19930-MS
... to this type of concept. The first is the ability to operate in harsh environments such as the North Sea, where tough weather conditions prevent FSV interventions much of the time, or even in Arctic seas where ice (figure 3) rules out the possibility of vessel intervention during the winter period. Figure 3...
Journal Articles
SPE Form Eval 8 (03): 194–200.
Paper Number: SPE-20600-PA
Published: 01 September 1993
... of molecu- lar diffusion between these two different fluid volumes, we meas- ure a single relaxation time constant TI instead of two superimposed relaxations: lITI = lITbl +(Fsv)h/Tsi ' (1) Tbl =3.7 at 10 MHz. By itself, h would relax with time constant Tsi . For this equation to be valid, diffusion must...
Journal Articles
J Pet Technol 40 (09): 1197–1202.
Paper Number: SPE-16562-PA
Published: 01 September 1988
... spread. The 1W58 was used in preference to the dedicated field support vessel (FSV) because the 1W58's relative stability vs. the dynamically positioned FSV offered a wider working-weather margin for installation of the manifold. The installation procedure comprised the shutdown and purge of TW 58 to w...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2008
Paper Number: OTC-19672-MS
... in line with the PSA requirements. RIG OPS RIG OPS MARINE SIMOPS URF RIG OPS MARINE SIMOPS URF FSV MPV RIG OPS MARINE SIMOPS URF FSV MPV FPSO ARRIVAL & RIG OPS MARINE SIMOPS URF FSV MPV FPSO ARRIVAL & FPSO HUC RIG OPS FSV MPV FPSO PROD SIMOPS MARINE SIMOPS er Riser Tower Angoflex Sonamet OTC 19672 5...
Journal Articles
J Pet Technol 67 (08): 101–105.
Paper Number: SPE-0815-0101-JPT
Published: 01 August 2015
..., such as Angolan waters, already host micro-organisms well- suited to bio- degradation of hydrocarbons. The SSDI kit was loaded on a field support vessel (FSV) on 9 10 Novem- ber 2013. The SSDI kit (Fig. 1) is com- posed of a coiled-tubing termination head (CTTH), a subsea dispersant mani- fold (SDM), dispersant...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50586-MS
...). It is simple to install, offers high productivity and only requires basic workover techniques to replace the ESP, especially when used in conjunction with a formation saver valve (FSV). Coiled tubing equipment is not needed and therefore completions of M- 11 s length become possible. Coiled tubing...
Proceedings Papers

Paper presented at the CORROSION 2014, March 9–13, 2014
Paper Number: NACE-2014-3894
...) will be performed. ACKNOWLEDGEMENTS The IGF-project (16196 N / 1) of the Research Association for steel deformation (FSV) was supported by the AiF in the framework of the program to promote industrial research and development (IGF) by the Federal Ministry of Economics and Technology based on a decision...

Product(s) added to cart

Close Modal