1-20 of 2405 Search Results for

F nipple

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, March 7–8, 2001
Paper Number: SPE-68366-MS
... as a bull-nose, with 2 ea nozzles in a 45° angle forward. This for cleaning the remaining feet's down and in the DHSV nipple profile. The DHSV was then pulled by W/L and a 2.26" OD broach was run on W/L down to the Model F nipple @ 11960 ft MD. A 2,5" OD broach was also run but not able to pass 630 ft MD...
Proceedings Papers

Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 6–8, 2018
Paper Number: SPE-193507-MS
... three landing nipples spaced out at predetermined intervals to enable the installation of flow control valves. The three landing nipples are the 2.813" tubing retrievable surface controlled subsurface valve, the 2.75" F top no go nipple and the 2.75" R bottom no go nipple. The slick line problems...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10459-MS
... the result of extreme compression and tensile forces acting on the tubing threads. Wells completed in the Arun Limestone are capable of producing 250 MMSCFD at well-head pressures and temperatures of 4000 psi and 347 degrees F. Forces on the tubing string varying from 350,000 lbs compression to nearly...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 5–8, 2006
Paper Number: SPE-101316-MS
... in wellhead and seal performance. For the purposes of this paper, the following definitions for pressures and temperatures at the wellhead are used9: HP/HT: Pressure exceeding 10,000 psi (690 bar) and/or Temperature exceeding 250 °F (121°C) X-HP/HT: Pressure exceeding 15,000 psi (1,034 bar...
Proceedings Papers

Paper presented at the SPE Gulf Coast Section/ICoTA North American Coiled Tubing Roundtable, February 26–28, 1996
Paper Number: SPE-36335-MS
... SCHEMATIC, WELL E-11 4-1/2" X 13-3/S", 5000 PSI WP CIW THM 13-3/S", 72 PPF N-aO CASING AT 1935' 1/2 SAND 9-5/8", 53.5 PPF P-110 CSG SHOE AT 6637' OPEN HOLE GP COMPLETION FROM 6650' - 6975' W/11" UNDERREAMER SSSV CAMCO 3-1/2" EUE, TRB-8-FSR SSSV AT 376' ~F"" BAKER 3-1/2" EUE 'F' NIPPLE AT 423' ~~I 3-1/2...
Journal Articles
J Pet Technol 70 (04): 84–85.
Paper Number: SPE-0418-0084-JPT
Published: 01 April 2018
... offshore Sabah. The operator has been tasked to develop the KN ultradeep HP/HT reservoir (pressures exceeding 12,000 psi, temperature exceeding 300°F). The well production-casing envelope consisted of a single 10¾-×10⅛-×9⅞-in. production casing, while the reservoir section was drilled and then covered...
Proceedings Papers

Paper presented at the SPE/CERI Gas Technology Symposium, April 3–5, 2000
Paper Number: SPE-59744-MS
... all other parameterswithin practical limits. Analysis Most production tests are diagnosed and analyzed using the standard log{P} vs.log{f(t)} with derivative plot (actually dP/d[ln{fn(t)}]) plotted againstlog{f(t)}), commonly called the log-log plot. Once wellbore storage has beenidentified...
Proceedings Papers

Paper presented at the Middle East Oil Show, March 11–14, 1995
Paper Number: SPE-29830-MS
... . . .. b 0 0 0 b 0 0 0 0 0 0 0 0 D EP TH (F T) 54 1 0' ) CJ 'I . . . . l . . . . l b 0 0 ID OD MIN MAX ITEM DESIGNATION INCH INCH 3.958 11.0 4%" TUBING HANGER ~ r1 ~ r1 2,992 4.5 X-OVER 4%" PIN X 3%" PIN r 2.992 3.5 3%" TUBING ~ ~~ ~~ ;. - 2.992 3.862 3%" FLOW COUPLING 2.813 4.632 3%" DHSV NIPPLE n n ~ u...
Journal Articles
SPE Prod & Oper 4 (03): 313–320.
Paper Number: SPE-15869-PA
Published: 01 August 1989
... line HI~ 'iT' I I I I I I I I I I I I I I I I I I I I 3'813· nipple I I pocking element 2~" EUE tubing __ I I I I I I r-t (I I 'Itttball valve \1 I I I I I I I I I I I I ~ ~ II % t% I el v: t l"7r-j,gI'-V Annular safety V v:: F. I v;: - mud line gas vent sleevet'74-1-1-'Vj7'l .1N packer...
Proceedings Papers

Paper presented at the SPE Latin America/Caribbean Petroleum Engineering Conference, April 23–26, 1996
Paper Number: SPE-36088-MS
...-4RB GRADE X-5 CSG SHOE AT 604' 13-3/8", 72 PPF, SEAL LOCK BOSS, N-80 CSG SHOE AT 5520' F J J 4-1/2" NEW VAM. 12.6 PPF. N·80 TUBING CAMCO 4-1/2" TRDP-1A-SSSV AT 364' BAKER 4-1/2" 'F' NIPPLE AT 410' XO, 3-1/2" FOX PIN X 4-1/2" EUE PIN AT 448' CAMCO 3-112" MMG-2-LS GLM'S (5) 1. 2346' 4. 6270' (w/Dummy 2...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, March 23–24, 2004
Paper Number: SPE-89644-MS
...) High temperature equipment (300 degrees F assurance testing) Staffing levels identified (supervisory and operators) Two phase milling of nipples and windows Equipment availability Nitrogen (liquid versus membrane) Coil purchase, owner and lead-time Formation deliverability Loss...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2012
Paper Number: OTC-23630-MS
... of the production tubing. To thisend, a unique landing nipple and slickline deployed plugging system wasdeveloped specifically for HPHT, capable of operating in all three regimes. Thenipple and plug system discussed in this paper was developed for a project inthe GOM and is rated to 25,000 psi and 450°F. The plugs...
Journal Articles
J Pet Technol 64 (05): 113–116.
Paper Number: SPE-0512-0113-JPT
Published: 01 May 2012
... was installed at 6900-m measured depth (MD) in Oseberg South Well 30/9-F-9 AY tIY2. The main bore was drilled to total depth (TD) at 8583 m MD, and the 7-in. liner was run and cemented. After the liner perforation, the MLT operations started with the installation of a multilateral anchor packer to allow...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, April 9–10, 2002
Paper Number: SPE-74819-MS
...) well environments in the North Sea, specifically on TotalFinaElf's Elgin and Franklin fields. Key areas covered include: the manufacturing and inspection of coiled tubing; new pressure-control equipment for pressures up to 15,000 psi and temperatures up to 390°F; installation, operation...
Proceedings Papers

Paper presented at the Middle East Oil Technical Conference and Exhibition, March 14–17, 1983
Paper Number: SPE-11471-MS
... in the same area. The experience gained from producing wells in such a gas reservoir is now being applied to the design and completion of wells in a new gas reservoir with a higher percentages of Hydrogen Sulphide and Carbon dioxide. Introduction The Thamama Zone ‘F’ sour gas reservoir was discovered...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 9–12, 2005
Paper Number: SPE-97300-MS
..., subsurface safety valves, and flow control nipples/plugs appear to be the nearest to implementation, but some design and qualification issues still need to be resolved. Current perforating technologies are reaching their limits at temperatures exceeding 450°F, thus require significant attention...
Proceedings Papers

Paper presented at the SPE High Pressure/High Temperature Sour Well Design Applied Technology Workshop, May 17–19, 2005
Paper Number: SPE-97560-MS
..., subsurface safety valves, and flow control nipples/plugs appear to be the nearest to implementation, but some design and qualification issues still need to be resolved. Current perforating technologies are reaching their limits at temperatures exceeding 450°F, thus require significant attention...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, March 23–24, 2004
Paper Number: SPE-89300-MS
... Abstract In February 2003 BP installed the first coiled-tubing deployed electric submersible pump in the Gulf of Mexico. The Grand Isle 40 F-1 well had been producing for several years with 2–7/8" jointed tubing, and the two previous electric submersible pumps lasted 16 and 30 months. Once...
Proceedings Papers

Paper presented at the 14th World Petroleum Congress, May 29–June 1, 1994
Paper Number: WPC-26143
.... The Halliburton/Westech system specifications are: – Camera diameter: 1% in (4.29 cm) – Operating pressure: 10000 psi (68 940 Kpa) – Operating temp: Normal 225 "F (107 OC) Max 250°F (121 OC) – Depth (cable deployed) 14000 ft (4267 m) – Cable diameter: in (0.56 an) Historically, usage...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 8–11, 1989
Paper Number: SPE-19524-MS
... are presented f or further development and use in both presented f or further development and use in both low-pressure and high-pressure applications. EXPERIENCE TO DATE South Pass Block 65 Offshore Louisiana SOI has used 32 low-pressure (3,000 psi) compact wellhead systems (shown in Figure 1...

Product(s) added to cart

Close Modal