1-20 of 241 Search Results for

Elevator bails

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
J Pet Technol 59 (08): 26–92.
Paper Number: SPE-0807-0026-JPT
Published: 01 August 2007
... conventional casing-running tools into one—power tongs, main hoisting elevators, bails and single-joint elevators, a fill-up/circulation tool, and a weight compensator. All system operations are remote so that no personnel are required in the derrick or on the rig floor, resulting in a significantly lower...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 1985
Paper Number: OTC-5017-MS
... of the guide rails, releasing the hook and swinging the top drive out of the way. The pipe handler portion of the top drive hangs below the electric motor and its dolly. The three major components of the pipe handler are a torque wrench, a set of bails and elevators, and a remotely operated drill pipe safety...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202398-MS
... operations. Be able to suit multiple wired drill pipe connections with minimal adjustments. Be able to suit multiple rig configurations (top drives, bails, elevators) with minimal adjustments. Be designed with secondary retention standards. Able to be activated remotely from the rig floor...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 17–19, 2009
Paper Number: SPE-119777-MS
... hanger seats on the load shoulder of the main shaft, thereby transferring load up the main shaft to the main bearing. This hoisting load path comprises from bottom to top: elevators, links, link hanger, link hanger suspension, load shoulder, main shaft, main bearing, bearing housing, bail, hook...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 20–22, 2007
Paper Number: SPE-105822-MS
... for making up threaded joints of casing to build the casing string. The methods also include casing elevators connected to bails suspended from the traveling blocks, gripping around the casing string in order to hoist and lower the casing string into the well. Over the last 15 - 20 years, drilling operations...
Proceedings Papers

Paper presented at the Middle East Drilling Technology Conference & Exhibition, October 26–28, 2009
Paper Number: SPE-125633-MS
..., to the main body of the tool, then to the top drive. This unit combines several tools: power tong, main elevator, weight compensator, fill up/circulation tool, safety interlock system, bails and single joint elevator into one and frees up space on the rig floor that a power tong conventionally occupies...
Proceedings Papers

Paper presented at the SPE Middle East Oil and Gas Show and Conference, March 11–14, 2007
Paper Number: SPE-105304-MS
..., then to the top drive. This unit combines several tools: power tong, main elevator, weight compensator, fillup/circulation tool, safety interlock system, bails and single joint elevator into one and frees up space on the rig floor that a power tong conventionally occupies. (Shown in Figure 4) 2.2 Stabbing Device...
Proceedings Papers

Paper presented at the SPE Canadian Unconventional Resources Conference, October 30–November 1, 2012
Paper Number: SPE-162739-MS
... bails attached to the traveling block, conventional casing elevators and a standard cement head. Practically, this does not allow for rotation during cementation. Rigging up this equipment is time consuming and leaves the pipe motionless on bottom. Cement jobs under these circumstances are more prone...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, March 26–28, 2013
Paper Number: IPTC-16713-MS
... of tripping casing in stands. Upstream Oil & Gas double-joint stand requirement triple-joint stand iptc 16713 drilling operation elevator link tilt bail setting casing operator casing-running operation operation casing-running time international petroleum technology conference Top...
Proceedings Papers

Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 25–27, 2021
Paper Number: SPE-202162-MS
... practiced the speed increased significantly and reached ADNOC expectations of 10-12 joints/hour. The single joint elevator (SJE) frequently got stuck and needed to be replaced with an oversize SJE that cleared the upset on the box end. An 8 ft extension bail had been added to the 15 ft drilling bails...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 27–March 1, 2001
Paper Number: SPE-67808-MS
... was at 620 m, caused the fall of the BOP and about 600 m of riser. The top drive felt and passed through the rotary table and, some other parts (bails, balls back-up wrench, elevator, riser running tool and few other metal debris) felt on the seabed with the BOP and the riser.The vessel returned to Cape Town...
Proceedings Papers

Paper presented at the Fall Meeting of the Society of Petroleum Engineers of AIME, September 30–October 3, 1973
Paper Number: SPE-4609-MS
... depicts this special equipment. Basically, it involves a power swivel and special cementing head. Elevator bails are attached to the power swivel. All rotation takes place below the power swivel. Back-up is provided by a torque line attached to the derrick about the height of the monkey board...
Proceedings Papers

Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, January 29–31, 2018
Paper Number: SPE-189411-MS
..., accessories and cables on rig floor Bail Extensions Fill-up tool Single joint elevator Full capacity elevators Service loop for the elevators HPU Stabbing board Elevated platform 20 ft lorry for the delivery of all components 40 ft lorry for the delivery of all components Two...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-167969-MS
... utilized for casing handling and running includes: Hydraulic Power Tong Power Unit (diesel-powered or AC-powered hydraulic pump) Spider (manual, pneumatic, or hydraulic) Elevator Bails (links) Single Joint Elevator Fill and Circulate Tool Manual Back-up Tongs...
Proceedings Papers

Paper presented at the Canadian International Petroleum Conference, June 8–10, 2004
Paper Number: PETSOC-2004-244
..., in the hope of providing a sober depiction of the pollution. Activities The main activities of this monitoring stage included: Measurement of the thickness of the free oily phase in different wells (points) in the whole area of the refinery. Bail down tests for the evaluation of the free phase flow...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 1–3, 2011
Paper Number: SPE-139909-MS
... casing elevator, power tong, fill-up/circulating tool and bails/single-joint elevators into one system. The system enabled hands-free pick up and make up of casing joints into the casing string and added the ability to immediately rotate, reciprocate (or push down) and circulate the entire casing string...
Proceedings Papers

Paper presented at the Annual Technical Meeting, June 6–8, 1995
Paper Number: PETSOC-95-93
... may be missing, contain ambiguous information, or be unreadable because oil has been spilled or has leaked from the container. Shipment or storage at elevated temperatures accelerates changes to oil composition, which can change viscosity. Samples can also be contaminated by unclean containers. Sample...
Journal Articles
Trans. 48 (01): 651–675.
Paper Number: SPE-915651-G
Published: 01 December 1915
..., set a screen in this horizon and cemented in a casing above the screen without a bubble of gas showing, and not until the pressure was reduced by bailing of the well did gas show. Also, by the !'lame method I have drilled through a known artesian water-bearing horizon between 1,900 and 2,000 ft...
Journal Articles
SPE Drill & Compl 20 (02): 9–122.
Paper Number: SPE-87186-PA
Published: 14 June 2005
... alternative to the system presented in this paper is to use dual elevators that operate in conjunction with a conventional landing string. In this approach, the elevator, while holding the landing string by the box-tool joint, is landed out at the rotary table. The bails are then removed and connected...
Journal Articles
J Pet Technol 64 (05): 94–96.
Paper Number: SPE-0512-0094-JPT
Published: 01 May 2012
... and 1,415-ft Chinook perforating BHAs in less than 6 hours, from pick- ing up the first gun to making up the last tool. Making the tool string into pre- torqued assemblies saved time on the critical path at the rotary. A fit-for-purpose set of becket and bails was built to fit the rig elevators. The becket...

Product(s) added to cart

Close Modal