1-20 of 43 Search Results for

Champion pending tasks

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
J Pet Technol 61 (03): 18–20.
Paper Number: SPE-0309-0018-JPT
Published: 01 March 2009
... working stiff at Shell, this helped me to accelerate my personal technology learning curve and to be an early champion of some key res- ervoir engineering technologies; today, as an external consultant, peer-reviewed papers help me to clearly communicate and demonstrate concepts and ideas to clients...
Journal Articles
J Ship Prod Des 19 (01): 16–21.
Paper Number: SNAME-JSP-2003-19-1-16
Published: 01 February 2003
... designate a representative to champion the overall process. Properly accomplishing an out- sourcing analysis takes substantial work, so adequate human resources and funding need to be allocated to it. Top manage- ment also needs to create an oversight group that can represent them in developing the list...
Proceedings Papers

Paper presented at the SPE International Conference and Exhibition on Health, Safety, Security, Environment, and Social Responsibility, April 11–13, 2016
Paper Number: SPE-179414-MS
... to in-house training. The project leadership sought volunteers from among the workforce to be appointed as " Intervention Champions " (2014). Intervention champions received additional training on the theory of intervention and how best to role model the wanted behaviours and act as mentors for the workforce...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2013
Paper Number: OTC-23931-MS
... of the Operator Participants TOTAL, BP, and Shell. TOTAL is championing the project. Subcontractors include DNV, ETA International, and MCSKenny. DeepFlex Flexible Fiber Reinforced Pipe (FFRP) is unbonded flexible pipe employing composite reinforcement materials for the pressure armor and tensile armor. Unbonded...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184737-MS
... throughout the world, and the logic's thresholds were calibrated from these test cases. Alerts are triggered only when criteria for specific hazards are met. This method champions hazards avoidance through prevention and ultimately reduces noproductive time (NPT) in well construction. This system enables...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 19–22, 2010
Paper Number: SPE-135316-MS
... on their procedures for providing data access. Engage vendors and operator's multiple IT and IP groups and policies to negotiate and approve procedures for data connections to the data aggregator server. Have a Senior Manager champion who can be counted on to provide the support and authority under which...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2014
Paper Number: OTC-25084-MS
... and Statoil. TOTAL is championing the project. Sub- contractors include DNV, ETA International, Southwest Research Institute and Wood Group Kenny. DeepFlex Flexible Fiber Reinforced Pipe (FFRP) is unbonded flexible pipe employing composite re- inforcement materials for the tensile armor and both metallic...
Proceedings Papers

Paper presented at the ASSE Professional Development Conference and Exhibition, June 9–12, 2008
Paper Number: ASSE-08-513
... in activities to visibly show involvement. Finally, accountability translates to not tolerating poor safety performance or performers at all levels of the organization. The role of senior managers regarding involvement entails becoming a safety champion as well as constantly communicating the vision...
Journal Articles
Oil & Gas Fac 2 (04): 49–60.
Paper Number: SPE-165574-PA
Published: 31 July 2013
..., Shell Project and Technology; Bjorn-Andre Egerdahl, Statoil USA E&P; Moussa Kane, Total E&P USA Inc. We also gratefully acknowl- edge the Working Committee Champions for the RPSEA DW3100 Study, Khalid Mateen and Aurelie Michel of Total E&P USA, Inc., for their expert advice and sound guidance...
Journal Articles
J Ship Prod Des 5 (03): 188–199.
Paper Number: SNAME-JSP-1989-5-3-188
Published: 01 August 1989
... identifies those items (because someone is asking for them) and "pulls" them ahead of the others. This practice quickly destroys the credibility of any schedule as the items without a champion ow wait even longer. A worse situation occurs when there are too many expeditors. Now all the products are the most...
Journal Articles
J Ship Prod Des 4 (02): 81–93.
Paper Number: SNAME-JSP-1988-4-2-81
Published: 01 May 1988
... it influenced the priorities of a task force established to improve engineering effectiveness, ultimately the task force was dissolved in response to short-term pressures to complete delivery of the first ship on a major contract on schedule. Why was this improvement effort cut short just as it was gaining...
Proceedings Papers

Paper presented at the International Conference on Health, Safety and Environment in Oil and Gas Exploration and Production, September 11–13, 2012
Paper Number: SPE-156858-MS
.../IIF Champions. Encouragement of IIF Program at formal meetings and workshops. Demonstrating IIF behaviors in the workplace by supporting Stop Work Authority. JMJ workshops highlighting the importance of raising concerns and listening to others. IIF Advisor Leadership and Supervisor workshops...
Proceedings Papers

Paper presented at the North Africa Technical Conference and Exhibition, April 15–17, 2013
Paper Number: SPE-164639-MS
... bought into the revised strategy and agreed to actively support the initiative by nominating candidates and mandating them to work together to make the project a success. Engagements progressed to the Production Technology and Regional Development Smartfield champion to forge a joint operations platform...
Proceedings Papers

Paper presented at the SPWLA 61st Annual Logging Symposium, June 24–July 29, 2020
Paper Number: SPWLA-5075
... Engineer, she obtained her M.S and PhD degrees from Yale University in 1998. She has co- authored more than 40+ peer-reviewed publications and has over 24 granted US patents and 18 pending patent applications. Harish B. Datir is a Petrophysics Domain Champion for Scandinavia. He is based in Stavanger...
Proceedings Papers

Paper presented at the CORROSION 2000, March 26–31, 2000
Paper Number: NACE-00020
... SEA OIL F IELDS Nihal Obeyesekere, Ali Naraghi, Dharma Abayarathna, Rupi Prasad Champion Technologies Inc. Technology Center 3130 F.M. 521 Fresno, TX 77545 Harry Montgomerie Champion Blacksmith Abbotswell Road, West Tulos Aberdeen AB 12 3AD, United Kindom ABSTRACT The paper describes the synthesis...
Journal Articles
J Ship Prod Des 8 (02): 105–110.
Paper Number: SNAME-JSP-1992-8-2-105
Published: 01 May 1992
... on Engineertng Management, EM-29, 1982, pp. 28-45. 7 Rogers, E. M., Dtffusmn of Innovatwns, Free Press, New York, 1983 8 Chakrabarti, A K., "The Role of Champion in Product Innova- tmn," Caltfornta Management Rewew, Vol. 17, No. 2, 1974, pp. 58-62. 9 Chakrabarti, A. K. and Hauschlldt, J., "The Dwlslon of Labour...
Journal Articles
J Pet Technol 46 (12): 1073–1079.
Paper Number: SPE-26788-PA
Published: 01 December 1994
...- cated champions. New initiatives are screened and ranked to make optimum use of limited resources. A multidisciplinary team rou- tinely monitors and reports on progress against the targets. As a re- sult of these focused and integrated efforts, actual production ex- ceeded forecasted production levels...
Proceedings Papers

Paper presented at the SPE/AAPG Western Regional Meeting, June 19–22, 2000
Paper Number: SPE-62573-MS
... these employees with the standard against which they would be auditing. Using employees throughout the company to perform this task develops champions or experts on the EMS in many Departments. Audits are scheduled at least once a year to cover all elements of the ISO Standard. Teams of at least two auditors...
Journal Articles
J Ship Prod Des 22 (02): 87–98.
Paper Number: SNAME-JSP-2006-22-2-87
Published: 01 May 2006
... reviews and belts held accountable. A replication champion should be designated in the Six Sigma office. This person should be part of Six Sigma project teams to help solidify the role of replication in process improvement ini- tiatives. Further, this person can act as liaison with the Knowledge...
Journal Articles
J Ship Res 2 (01): 57–66.
Paper Number: SNAME-JSR-1958-2-1-57
Published: 01 March 1958
... of the results are difficult to com- prehend. This led Lerbs, Tachmindji, and others at the David Taylor Model Basin to champion more basic ex- perimental and theoretical investigations. Taehmindji then undertook the measurement of the pressure field about a model of a ship propeller in the absence of boundaries...

Product(s) added to cart

Close Modal