1-20 of 1550 Search Results for

Body lock rig

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 3–6, 1998
Paper Number: SPE-39343-MS
... makeup torque ram assembly groove drilling equipment body groove assembly automation reconfiguration clearance hole antirotation bar lock bar bonnet well control equipment m4C .. . .Society of Petroleum Engineem lADC/SPE 39343 Automation of BOP Bonnet Access: A No Bolts Approach B.A...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2013
Paper Number: SPE-166379-MS
... in the Sabah water of East Malaysia lost its functionality due to a leak in the control line. The SCSSV body was also found to be leaking from tubing to annulus which resulted in the failure to successfully lock open the SCSSV. Initially a major rig work-over had been anticipated to pull the tubing and replace...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 4–6, 1997
Paper Number: SPE-37662-MS
... barrels yet to be found. The Former Soviet Union countries of Azerbaijan, Kazakhstan, Turkmenistan and Russia, and Iran, surround this land locked body of water (Fig. 1). Following the dissolution of the Soviet Union, several international oil companies began negotiations to participate in the development...
Proceedings Papers

Paper presented at the SPE Nigeria Annual International Conference and Exhibition, August 6–8, 2018
Paper Number: SPE-193507-MS
... hole problems. In the quest to solve this problem and adding to body of knowledge, Addax petroleum team of engineers introduced a tubing tester valve as part of the completion string and used it to test the pressure integrity of the completion string connections while running in hole. In carrying out...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 29–October 2, 2002
Paper Number: SPE-77572-MS
... thermochemical method the so-called self- generated nitrogen (SGN) method was applied to heat and dissociate the crystallized hydrate, which was clogging the tree-cap-locking-pin s piston chamber. Heat application around the body of the Christmas tree enabled us to dissociate the hydrate and release the tree...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 3–6, 1999
Paper Number: OTC-10968-MS
... gages were used on the segments. Biaxial gages were used on the body and the hub to measure hoop and axial strains. Figure 5 shows the strain gage placement layout. In addition to the test specified in API 17D, a self-locking test and an angle pull-off test were performed. The self-locking test involved...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 26–27, 2019
Paper Number: SPE-194267-MS
... tested barriers in place, BOP was nipple down and the rig was released. The specifications of the plug are 3.813" TICX Selective Lock mandrel OEM is Tools International Corporation Body metallurgy: 9-Chrome (80k); Inconel X-750 Maximum OD: 3.812", Minimum ID of lock: 2.62" Tensile...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 23–26, 1979
Paper Number: SPE-8437-MS
... surfaces) is stored in a large helical spring. The two-piece body is locked together with fluid actuated detents. The mud flows through the bit body and exits through five nozzles in the bit head. A single small nozzle in the bit body is used to wash out the chain cavity. A unique feature of this design...
Proceedings Papers

Paper presented at the IADC/SPE Asia Pacific Drilling Technology Conference, August 22–24, 2016
Paper Number: SPE-180623-MS
... landing rings, diverter adaptors, mandrel casing hangers, integral lockdown for casing hanger pack-offs, metal-end-cap seals, multi-stage compact bowls, quick make-up BOP adaptors, tubing hangers with integral body seals, TWCV (Two-way-check-valve) profiles, bonnet-LMV (Lower-master-valve) interface...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173642-MS
... overshot that includes packing for a seal and a body lock ring to secure the receptacle to the mandrel. The body lock ring engages with a wicker thread section to keep the connection in place. The receptacle top is a standard STL box connection and is made up to whatever length of base pipe is required...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 9–12, 1986
Paper Number: SPE-14750-MS
... Abstract The Modular Blowout Preventer (BOP) stack integrates, in a compact way, the main components of an underwater BOP assembly. In this approach the annular BOP, the ram BOP's and the wellhead connector are locked together using four hydraulically pretensioned stud bolts that extend...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 1986
Paper Number: OTC-5320-MS
... internal parts (Figure 4) within its 8-5/8 inch diameter body which are activated remotely to lock or release the guidepost at the template; no internal moving parts are fabricated into the template or guidepost receptacle. The major components of the remote guidepost are the outer body, the inner sleeve...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183382-MS
... collars. The high integrity packer combines features of traditional retrievable packers and hydraulic set permanent packers. It consists of four main component sections; stinger, setting mechanism, packer body and seal bore. While running in the hole, the stinger is locked to the packer body...
Proceedings Papers

Paper presented at the SPE Latin America Petroleum Engineering Conference, October 14–19, 1990
Paper Number: SPE-21152-MS
... locking dogs that 5 - CONCLUSION The requirement for reducing the rig time and the templates size and cost contributed greatly for the development of reusable PGB's. The high costs involved in divers intervention, the ROV newcome, the technical improvements in operation using moored floating rigs...
Proceedings Papers

Paper presented at the SPE Middle East Oil and Gas Show and Conference, September 25–28, 2011
Paper Number: SPE-140981-MS
... Abstract The handling of drilling jars can present safety hazards when they are being serviced, transported, loaded or unloaded, handled on the rig floor, run in hole or racked in the derrick. Dangers are especially prevalent if the drilling jar is not equipped with a mechanical locking device...
Journal Articles
J Pet Technol 42 (03): 272–327.
Paper Number: SPE-18240-PA
Published: 01 March 1990
... the design of the remotely operatedguidepost (Fig. 4). The post has an 8.62-in. [219-mm] -diameter outer body witha latching profile on top and a landing ring near the bottom that lands in thefunnel receptacles on the template. Two spring-loaded, outwardly biased latchdogs at the bottom of the post anchor...
Proceedings Papers

Paper presented at the Offshore Technology Conference Brasil, October 29–31, 2019
Paper Number: OTC-29943-MS
... not be limited by the lock ring itself, but something else within the design, such as threads or through body stresses. As stated, a production well could see as many as 200 cycles over its life; therefore, the other hurdle to overcome is the industries perception of how dynamic metal seals degrade after each...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-13976-MS
... on the average about once every three to five years. The conventional subsea tree/tubing hanger set up design requires the tree to be tripped and a rig BOP stack run to pull the tubing. This operation is time consuming, very weather sensitive and leaves the well temporarily without a well control stack...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, November 15–17, 2011
Paper Number: IPTC-14324-MS
... Abstract The handling of drilling jars can present safety hazards when they are being serviced, transported, loaded or unloaded, handled on the rig floor, run in hole or racked in the derrick. Dangers are especially prevalent if the drilling jar is not equipped with a mechanical locking device...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 27–30, 1987
Paper Number: OTC-5508-MS
... inch casing string. This full cement return locks the wellhead body into the 30 inch conductor housing. External loads applied to the wellhead body are transferred through the cement to the conductor housing, causing the total load to be shared between the 30 inch conductor and 20 inch casing...

Product(s) added to cart

Close Modal