1-20 of 297 Search Results for

Blind nipple

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10459-MS
... of exerting 500,000 lb compression or tension. Two side outlets are fitted with blind hubs (40 and tapped for ½ inch NPT for recording chamber pressure and providing a relief valve. The test specimen is made up of two 7-inch, 35 pounds per foot nipples or pup joints (5) joined by a coupling (6). The specimen...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition - Americas, August 28–30, 2018
Paper Number: SPE-190954-MS
... for BBA – 2.3/8" hydraulic anchor - Gas buster – 2.7/8" TBG tail pipes - Blind coupling – 5" casing 20.8 lbs-ft Figure Rods – 2.7/8" EU-HE TBG - Mechanical pump with mosquito bill of 1.5 (38.1 mm) DE pipes – 2.27" (57 mm) DI N1125 nipple for BBA – 2.3/8" hydraulic anchor - Nipple to fix 2.3/8...
Images
2.27&quot; (57 mm) DI N1125 <span class="search-highlight">nipple</span> for BBA – 2.3&#x2F;8&quot; hydraulic anchor - Gas buste...
Published: 28 August 2018
Figure 2.27" (57 mm) DI N1125 nipple for BBA – 2.3/8" hydraulic anchor - Gas buster – 2.7/8" TBG tail pipes - Blind coupling – 5" casing 20.8 lbs-ft More
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 27–29, 2014
Paper Number: SPE-170634-MS
... of Capillary tubing 3/8″ Duplex 0.170 ppf + Injection Valve Brief summary during fishing/tools run A. 3.78″ Wire grab (3 prong) on 2-1/2″ FRC to 759 mWL, recover 20 cm of CS in several runs Not able to latch at first attempt, but able to latch after the fish beat down with wire finder and blind box...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199858-MS
... step consisted on performing the PLT job with a tool string that included a Pressure-Temperature and Spinner Flowmeter ( figure 3 ), in order to identify the leak , following the next steps: RIH with GR/CCL and blind box 2.70 to tag above monolock plug. RIH with drift plug and GR/CCL...
Proceedings Papers

Paper presented at the SPE Americas E&P Health, Safety, Security, and Environmental Conference, March 21–23, 2011
Paper Number: SPE-142204-MS
... can be represented in the analysis. The subsea drilling BOP is composed by four sub parts: the BOP housing, wellhead connector, supply and control lines subpart (DRLG_BOP_X_HSG); the blind and shear rams subpart (DRLG_BOP_X_BLND); the pipe rams and annular BOP subpart (DRLG_BOP_X_RAM...
Journal Articles
Trans. G-25 (01): 315–326.
Paper Number: SPE-925315-G
Published: 01 December 1925
..., SHOWING STEAM LINE BELOW OIL LINE WITH BLIND STEAM-NIPPLE (RADIATOR) EXTENDING UP THROUGH OIL NIPPLE TO FORM CONTACT WITH SAND. dry heat may be carried into the sand. In the former case live steam is occasionally turned into the pipe line and through the oil nipples into the oil stratum. In the latter...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 22–23, 2016
Paper Number: SPE-179052-MS
...: 12-in. quick union box x 9-in. 3K flange A 9-in. ID, Dual blind ram wireline valve with 12-in. quick unions Two riser sections – 9-in. ID with 12-in. quick unions – with bleed off Crossover from 6½-in. quick union box x 12-in. quick union P/C Lubricators with 6½-in. quick unions...
Proceedings Papers

Paper presented at the Offshore Mediterranean Conference and Exhibition, March 28–30, 2001
Paper Number: OMC-2001-043
... meters above the pump off / sheardisk sub for subsequent retrieval of the string. This complete assembly was made up in a workshop and pressure tested to 1305 psi (90 bar) prior to going offshore. The following BOP stack was nippled up from top to bottom: 7 1/16 blind / shear rams, 2x 7 1/16 dressed 2...
Journal Articles
J Pet Technol 26 (01): 25–32.
Paper Number: SPE-4320-PA
Published: 01 January 1974
... operations related to drilling amounted to 190 hours, or almost twice the time spent rotating. Most of the 190 hours was spent circulating and conditioning, pumping out clay rings, cleaning mud ditches loaded with clay balls, and cleaning blinded shaker screens. This paper assesses the gumbo problems...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition - Americas, August 28–30, 2018
Paper Number: SPE-190966-MS
... concordant to the nodal analysis that matched the actual reservoir pressure. Then the SlickLine (SL) blinded the 1 st and 2 nd Mandrels and a Mobile Pumping Unit (MPU) filled the hermetic tubing string. Later the FlushBy entered and lowered down an API-type insert pump, rods and finally the polished...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 22–23, 2016
Paper Number: SPE-179053-MS
... Blind box selection: Maximum range = tubing ID −  (rope socket OD/2) + (wire OD/2) = 4.892  in . − (1 .750 in ./2) + (0 .125 in ./2) = 3,9454 in Minimum range = tubing ID − (tool strong maximum OD/2) + (wire OD/2) = 4 .892...
Journal Articles
J Pet Technol 30 (10): 1392–1402.
Paper Number: SPE-6917-PA
Published: 01 October 1978
.... The cellar was latched to the wellhead housing as the BOP's had been previously. The WHC, with all of the equipment inside, weighed about 150,000 Ib in air and about 45,000 Ib in the water. A blind flange on· top of the WHC's bottom spool prevented sea water from entering. The WHC contained the air...
Journal Articles
Trans. 86 (01): 322–328.
Paper Number: SPE-930322-G
Published: 01 December 1930
... will bemade to discuss the ramifications of economic problems which enter into thechoice of a pressure medium. Apparatus and Materials The two 6-in. by 6-ft. flow tubes described in Technical Publication 144 wereused in these experiments. They consist of 6-ft. sections of 6-in. casing witha blind flange...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 26–27, 2019
Paper Number: SPE-194228-MS
... and create a seal between them. BHA should be able to run VS in blind/closed end conditions to provide a barrier between the CT and well; BHA should have a device to permit a recovery of the well's VS without killing the well. Proposal Design After meeting with the operator, the proposal to run...
Journal Articles
J Pet Technol 12 (09): 31–34.
Paper Number: SPE-1477-G
Published: 01 September 1960
... Fig. 2 - Typical equipment hook-up for use in the Borger, Tex. area at 3,000 ft. JOURNAL OF PETROLEUM TECHNOLO(;Y Gas rI!iO2 ~8 in Casing ", fin EUE Pumping string " Blind cage ' " Traveling barrel insert pump " Screen " Slip - type hold - down with rubbers removed Fig. 3-0il enters through the screen...
Journal Articles
SPE Prod & Oper 33 (03): 437–448.
Paper Number: SPE-183821-PA
Published: 19 January 2018
... engageable on the BHA or cable. The BHA was not stripped or lubricated into the well; instead, the closable BOP was capable of sealing on all BHA diameters during deployment. The lower dual-combi BOP was dressed with the pipe/slip, and the shear/blind rams were dressed for the 1.62-in. cable. Prior...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208496-MS
... Training Matrix, need to be verified and approved by Client. Clearance to Install BOP Below Main Deck What was supposed to happen ■ Nipple up and nipple down of BOP without obstruction or restrictions What actually happened ■ Due to differences of stack-up height for each well, Blind...
Journal Articles
Int. J. Offshore Polar Eng. 10 (03).
Paper Number: ISOPE-00-10-3-209
Published: 01 September 2000
.... This insertion, for which the inside diameter of the larger equals the outside diameter of the smaller, creates a tube-in-tube splice connection. Joining of the tube walls can then be accomplished by site welding or so-called blind bolting (Korol et al., 1993), but even the latter involves careful site alignment...
Journal Articles
J Pet Technol 72 (01): 66–67.
Paper Number: SPE-0120-0066-JPT
Published: 01 January 2020
... pressure and pipe in the hole by running competent pipe past the two lower pipe rams, and using them as an annular barrier while using the plugs and nipples in the work string as the in- ternal barriers. The lower blind shear is available should the annular barriers fail during this process, and a full...

Product(s) added to cart

Close Modal