1-20 of 11246 Search Results for

2.1 Completion operations

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 27–30, 1987
Paper Number: OTC-5573-MS
... hub top and 30 inch connector pin, or a mandrel wellhead top profile. These two types of completion head tops allow connection of either a 30 inch riser, or a subsea BOP, for workover operations. The completion head is ported for side annulus, 13.3/8 X 9.5/8 access, with two 2.1/16 5000 psi gate...
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Unconventional Resources Technology Conference, July 23–25, 2018
Paper Number: URTEC-2901615-MS
... workflow is very flexible depending on the available data, man power and expertise. Completion, production, reservoir, and geologic data from operators are used to evaluate operators' performance on 2.1 million acres, four formations, and eight intervals. The evaluations gave a better understanding to TOGI...
Proceedings Papers

Paper presented at the CORROSION 2000, March 26–31, 2000
Paper Number: NACE-00684
.... In May 1980, 19 tubes along the top row were plugged. A tube was puled for inspection that had fretting marks coindding with the baffle locations, and had completely broken at the last baffle during the removal operation. The remainder of the tube was in good condition. In October 1981, a hydrotest...
Proceedings Papers

Paper presented at the Middle East Oil Show, November 16–19, 1991
Paper Number: SPE-21330-MS
... and X-mas trees were inspected. Inspect ion results were correlated with different parameters which may influence CO2 corrosion in oil wells. Introduction Umm Al Dalkh Field (UAF), is an offshore oil field in the Arabian Gulf region operated by ZADCO. Wells were completed in 1981 and oil production...
Proceedings Papers

Paper presented at the SPE North Africa Technical Conference and Exhibition, September 14–16, 2015
Paper Number: SPE-175807-MS
...: Upper Baharyia Reservoir Upper A/R “G” Reservoir Lower A/R “G” Reservoir Work over operations in 2012–2013 may be divided to: SRP operations (replacement, redesign, and first completion) to get use of downhole pumps and increase production Hydraulic Fracturing Operations which...
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Unconventional Resources Technology Conference, July 23–25, 2018
Paper Number: URTEC-2884337-MS
...). The approach is easy-to-use but its prediction may be suboptimal due to lack of considerations in geology, fluid property, completion design, and production operation. Well performance can be also evaluated through reservoir simulation based on a realistic physical model. However, the model building process...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 1995
Paper Number: OTC-7830-MS
... in one template. Studies were made for one gas/condensate field and one oil field. The oil field imposes stricter require- ments to the response time of the HIPPS system due to faster pressure buildup (lower compressibility). The main field parameters are summarized in figure Figure 2.1. Complete field...
Proceedings Papers

Paper presented at the SPE/EPA Exploration and Production Environmental Conference, March 27–29, 1995
Paper Number: SPE-29750-MS
... $2.1 Million for proper plugging of the well and another $2.1 Million for remediation costs. Also in 1987, the state conservation commission ruled that the well was properly plugged and abandoned and ordered the operator to complete an approved remedia- tion plan. The case was appealed and was eventu...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123170-MS
... and to design/optimize production, transportation and processing facilities. Abstract Formation of gas hydrates can lead to serious operational, economic and safety problems in the petroleum industry due to potential blockage of oil and gas transmission lines and processing facilities. Thermodynamic...
Proceedings Papers

Paper presented at the CORROSION 2001, March 11–16, 2001
Paper Number: NACE-01601
.... The results of the computer modeled simulation, which optimized the design for touch potential control, are presented. Problems encountered in the mitigation system installation are discussed. Validation of the mitigation design was made by comparing voltage measurements made on the completed pipeline...
Journal Articles
J Pet Technol 73 (12): 8.
Paper Number: SPE-1221-0008-JPT
Published: 01 December 2021
.... Early indications suggest that if the pledges covering about 90% of global emissions are followed by action and completed in full and on time, a temperature increase of around 1.8°C to 2.1°C by 2100 could be seen. But without stronger actions taken to 2030, the temperature will likely be higher...
Journal Articles
J Pet Technol 59 (07): 28–30.
Paper Number: SPE-0707-0028-JPT
Published: 01 July 2007
... technologies, are enabling operators to fracture cased horizontal wellbores more effectively: sliding-sleeve completions and coiled-tubing (CT) fracturing applications. Sliding-Sleeve Completions The use of sliding sleeves for horizontal cased-hole fracturing is being adopted rapidly by the industry...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 15–18, 1994
Paper Number: SPE-27457-MS
... was planned to deliver six production and four injection wells to enable the platform to rapidly achieve its designed production plateau of 113,000 bbls/day upon completion of platform tieback operations. Serious drilling and weather problems caused an average well duration overrun of twenty-eight percent...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193978-MS
... setting, tubing punch and circulate the cement to plug tubing and A-annulus, balanced plug setting between tubing, A-annulus, and B-annulus. Cut the tubing below SCSSV and retrieve, and surface plug setting. The company proposed to leave the completion string unrecovered to speed up operation...
Proceedings Papers

Paper presented at the Middle East Health, Safety, Security, and Environment Conference and Exhibition, October 4–6, 2010
Paper Number: SPE-132344-MS
... to complete from concept development and preliminary engineering to full operations. JGC was the EPC contractor for the onshore plant. The facilities include two offshore platforms each with 12 wells, two 80 km, 36 inch underwater supply pipelines from the platforms to the onshore plant, a major onshore sour...
Proceedings Papers

Paper presented at the 54th U.S. Rock Mechanics/Geomechanics Symposium, June 28–July 1, 2020
Paper Number: ARMA-2020-1842
... is an important tool in understanding field operations within unconventional reservoirs. Hydraulic fracture growth within heterogenous reservoir rock is thought to be strongly influenced by material and stress contrasts, the presence of soft and/or weak laminations and leak-off along interfaces/discontinuities...
Proceedings Papers

Paper presented at the CORROSION 2017, March 26–30, 2017
Paper Number: NACE-2017-9089
... as 240,000 break per year. The cost of replacing over one million miles of corroded water and wastewater pipes was estimated as US $2.1 trillion if all pipes were to be replaced at once [1] . It is reported that 35% to 50% of this cost could have been avoided through proper design, operation, and corrosion...
Proceedings Papers

Paper presented at the SPE Middle East Health, Safety, Security, and Environment Conference and Exhibition, October 20–22, 2008
Paper Number: SPE-120533-MS
... Abstract Dolphin Energy Limited (DEL) is a Gas processing and distribution organization that produces and exports over 2.1 billion scfd of sales quality natural gas to the UAE and Oman from the State of Qatar. From inception to completion and full operation, the project took seven years...
Proceedings Papers

Paper presented at the International Petroleum Technology Conference, November 15–17, 2011
Paper Number: IPTC-14730-MS
... permeability from 30–50%. The results helped the operator to make decisions regarding planning of field development; for instance, open hole gravel pack completions for horizontal wells in the N-S direction are not an option for field development. Horizontal wells need to be cased and drilled in the SHmax...
Proceedings Papers

Paper presented at the ASSE Professional Development Conference and Exhibition, June 9–12, 2008
Paper Number: ASSE-08-551
... for the survey. The survey operated for about two weeks in late January 2008. BCSP sent email invitions to participate to about 7,000 individuals holding the CSP. With 14 days, the survey generated 2,572 completed responses, a 37% response rate and representing about 23% of all CSPs. No reminders to participate...

Product(s) added to cart

Close Modal