1-3 of 3 Search Results for

1.3.3 Wellhead integrity

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the 16th World Petroleum Congress, June 11–15, 2000
Paper Number: WPC-30321
... of stationary energy 136 POTENTIAL COST REDUCTIONS IN GAS TRADE services and power generation. An increasing 1.1 Production number of new electricity plants are fed by natural gas. The cost of transporting wellhead gas over long distance can be significantly reduced by Gas transportation, a constant challenge...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference, November 7–10, 1994
Paper Number: SPE-28782-MS
... topside and subsea work (excluding well maintenance). c. Well maintenance costs including wellhead equipment and flowline repairs and maintenance, workovers and downhole activities. d. Transport costs for personnel, supplies, materials, equipment and replacement parts by land, air or sea to the field...
Proceedings Papers

Paper presented at the OTC Brasil, October 4–6, 2011
Paper Number: OTC-22685-MS
.... No exposure suits were worn and the temperature of the sea water at the time was 29 degrees F (-2 deg Celsuis). The remains of the rig itself were found by sonar search over the following weeks, resting in an inverted position approximately 485 feet south-east of the wellhead, surrounded by major items...

Product(s) added to cart

Close Modal