Skip Nav Destination
Issues
En Route: The Production Capacity Challenge
J Pet Technol 62 (12): 12–13.
doi: https://doi.org/10.2118/1210-0012-JPT
Hydraulic Fracturing: The Fuss, The Facts, The Future
J Pet Technol 62 (12): 34–40.
doi: https://doi.org/10.2118/1210-0034-JPT
Thunder Horse Takes Reservoir Management to the Next Level
J Pet Technol 62 (12): 61–62.
doi: https://doi.org/10.2118/1210-0061-JPT
Gas-Reserves Estimation in Resource Plays
J Pet Technol 62 (12): 65–67.
doi: https://doi.org/10.2118/1210-0065-JPT
Improving Reserves Systems With Continual Reserves Management
J Pet Technol 62 (12): 68–69.
doi: https://doi.org/10.2118/1210-0068-JPT
Sand Settling in a Subsea Production System
J Pet Technol 62 (12): 76–79.
doi: https://doi.org/10.2118/1210-0076-JPT
The Performance of Mud Motors With Two Different Bent Housings
J Pet Technol 62 (12): 84–86.
doi: https://doi.org/10.2118/1210-0084-JPT
Managing Drilling Vibrations Through BHA-Design Optimization
J Pet Technol 62 (12): 87–88.
doi: https://doi.org/10.2118/1210-0087-JPT
Advertisement
Email alerts
Advertisement
Advertisement