Skip Nav Destination
Issues
Changing Perspectives (October 1997)
J Pet Technol 49 (10): 1068.
doi: https://doi.org/10.2118/1097-1068-JPT
Fields of Vision (October 1997)
J Pet Technol 49 (10): 1075.
doi: https://doi.org/10.2118/1097-1075-JPT
Innovative Remote-Controlled Completion
J Pet Technol 49 (10): 1089–1092.
doi: https://doi.org/10.2118/1097-1089-JPT
Deepwater, Remotely Actuated Completions for the 21st Century
J Pet Technol 49 (10): 1093–1095.
doi: https://doi.org/10.2118/1097-1093-JPT
Automatic Welding and Ultrasonic Inspection
J Pet Technol 49 (10): 1096–1100.
doi: https://doi.org/10.2118/1097-1096-JPT
Testing a Lower-Cost Remote-Control System
J Pet Technol 49 (10): 1101–1102.
doi: https://doi.org/10.2118/1097-1101-JPT
Meeting Deepwater Subsea-Completion Design Challenges
J Pet Technol 49 (10): 1103–1104.
doi: https://doi.org/10.2118/1097-1103-JPT
Real Savings From a Life-Cycle Management Approach
J Pet Technol 49 (10): 1105–1111.
doi: https://doi.org/10.2118/1097-1105-JPT
Underground Storage Operations
J Pet Technol 49 (10): 1112–1114.
doi: https://doi.org/10.2118/39101-JPT
Economic In-Place Casing Lining and Repair
J Pet Technol 49 (10): 1115–1116.
doi: https://doi.org/10.2118/1097-1115-JPT
Steam-Assisted Gravity-Drainage and Vapex Process Reservoir Screening
J Pet Technol 49 (10): 1122–1124.
doi: https://doi.org/10.2118/1097-1122-JPT
Cold Production of Heavy Oil (October 1997)
J Pet Technol 49 (10): 1125–1126.
doi: https://doi.org/10.2118/1097-1125-JPT
Deployment of a Coiled-Tubing Gas-Lift Completion
J Pet Technol 49 (10): 1127–1128.
doi: https://doi.org/10.2118/1097-1127-JPT
Reservoir Management of the Oseberg Field During 8 Years of Production
J Pet Technol 49 (10): 1134–1135.
doi: https://doi.org/10.2118/1097-1134-JPT
Profile Modification in Horizontal Slotted Liners
J Pet Technol 49 (10): 1136–1138.
doi: https://doi.org/10.2118/1097-1136-JPT
Advertisement
Email alerts
Advertisement
Advertisement