Skip Nav Destination
Issues
Proppant Selection: The Key to Successful Fracture Stimulation
J Pet Technol 37 (12): 2163–2172.
doi: https://doi.org/10.2118/12616-PA
Cementing - A Systematic Approach
J Pet Technol 37 (12): 2184–2196.
doi: https://doi.org/10.2118/11981-PA
Gravel Packing Highly Deviated Wells With a Crosslinked Polymer System
J Pet Technol 37 (12): 2197–2202.
doi: https://doi.org/10.2118/12481-PA
Crude-Oil Foaming Problems at the Sullom Voe Terminal
J Pet Technol 37 (12): 2211–2218.
doi: https://doi.org/10.2118/12809-PA
The Single Steel Drilling Caisson: A New Arctic Drilling Unit
J Pet Technol 37 (12): 2219–2229.
doi: https://doi.org/10.2118/12000-PA
Advertisement
Email alerts
Advertisement
Advertisement