SPE Member Price: | Free |
SPE Non-Member Price: | USD 17.00 |
SPE Member Price: | Free |
SPE Non-Member Price: | USD 17.00 |
This article is a synopsis of paper SPE 39369, "First Successful Multilateral-Well Installation From a Floating Rig: Development and Case History," by Austin Freeman, Halliburton Energy Services; Tore Gronas, Norsk Hydro; Frode Berge, SPE, Halliburton Oilfield Services (Norway) Inc.; and Doug Durst, SPE, and Mike Luke, Weatherford Enterra, originally presented at the 1998 IADC/SPE Drilling Conference, Dallas, 3-6 March.
File Size | 146 KB | Number of Pages | 3 |
Looking for more?
Some of the OnePetro partner societies have developed subject- specific wikis that may help.
![]() |
||
PetroWiki was initially created from the seven volume Petroleum Engineering Handbook (PEH) published by the Society of Petroleum Engineers (SPE). |
||
![]() |
||
The SEG Wiki is a useful collection of information for working geophysicists, educators, and students in the field of geophysics. The initial content has been derived from : Robert E. Sheriff's Encyclopedic Dictionary of Applied Geophysics, fourth edition. |