Predicting the behavior of rock mass during tunnel construction is a complex engineering problem, and it is important to conduct research to the extent that it is sufficient to define the characteristics of the terrain composition, before, during and after the construction of facilities. Engineering research works in the field and in laboratories differ in scope and type. In this paper, the established interdependencies of some of the basic parameters obtained during the testing of rock mass are presented:Edyn=f(Vp), Edyn=f(RMR) i Edyn=f(Q). Also, the relations between the engineering systems of rock mass classification and seismic primary waves are derived. RMR=f(Vp), Q=f(Vp). The relations were based on the examination of the rock mass for the construction needs of the tunnel on the Nis-Merdare highway. The results obtained in this study can be applied in environments that have similar lithological and structural characteristics.
Skip Nav Destination
5th Symposium of the Macedonian Association for Geotechnics
June 23–25, 2022
Ohrid, Macedonia
Methodology of estimation of rock material input parametars for tunnels on a highway e-80 Niš – Merdare in Serbia
Milorad Jovanovski
Milorad Jovanovski
Ss. Cyril and Methodius University in Skopje
Search for other works by this author on:
Paper presented at the 5th Symposium of the Macedonian Association for Geotechnics, Ohrid, Macedonia, June 2022.
Paper Number:
ISRM-MAG-2022-57
Published:
June 23 2022
Citation
Marinkovic, Nemanja, and Milorad Jovanovski. "Methodology of estimation of rock material input parametars for tunnels on a highway e-80 Niš – Merdare in Serbia." Paper presented at the 5th Symposium of the Macedonian Association for Geotechnics, Ohrid, Macedonia, June 2022.
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Could not validate captcha. Please try again.
Advertisement
6
Views
Advertisement
Suggested Reading
Advertisement