The PDF file of this paper is in Bosnian.

_

Abstract

The first phase of the first line of the Belgrade metro, with a total length of 21.2 km, is divided into 5 sections with relatively similar geological properties. These are the Makiš, Banovo brdo, Sava alluvium, Center and Danube alluvium sections. Shaft no. 3 "Trebevićka", which belongs to the Banovo brdo section, consists of a shallowly buried building, a vertical shaft and a horizontal connecting corridor. The paper will present the results of field investigations and laboratory tests with recommendations for the construction of the "Trebevićka" ventilation shaft.

This content is only available via PDF.
You can access this article if you purchase or spend a download.