Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: subway
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the 9th ISRM Congress, August 25–28, 1999
Paper Number: ISRM-9CONGRESS-1999-260
.... In Korea, over last two decades, there have been so many construction projects, for instance, metropolitan subway projects, highway construction projects, dam construction projects, Kyung-bu high speed railway project and so on. And from these, a number of borehole data have been acquired. These data may...
Proceedings Papers
Paper presented at the 8th ISRM Congress, September 25–29, 1995
Paper Number: ISRM-8CONGRESS-1995-088
... be obtained from [1]. 3 GROUND SURFACE MOVEMENTS AND DEFORMATIONS DUE TO SUBWAY EXCAVATION 3. 1 Subsidence for excavation subway with an arbitary cross-section A long horizontal subway of arbitary cross-section is excavated at depth H from the ground surface. It is clear that the problem can...
Proceedings Papers
Paper presented at the 1st ISRM Congress, September 25–October 1, 1966
Paper Number: ISRM-1CONGRESS-1966-218
... and for subway structures is frequent, and a part of such construction is the frequent exposure of footings founded on rock. Normally, it is assumed that these footings had been placed on unsound rock even if the records indicate that it was intended to found on sound rock. During the construction of the 6th...