Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-9 of 9
Keywords: Case History
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the 13th ISRM International Congress of Rock Mechanics, May 10–13, 2015
Paper Number: ISRM-13CONGRESS-2015-172
.... metals & mining 13th international congress stability Montreal drilling operation management kostecki Illinois Basin Coal Pillar Design reserves evaluation moisture content reliability unstable case history pillar design strength Case History floor stability equation probabilistic...
Proceedings Papers
Paper presented at the 12th ISRM Congress, October 16–21, 2011
Paper Number: ISRM-12CONGRESS-2011-260
... engineering practices, this paper presents a five-factor comprehensive method for rockburst criterion and classification. In addition, some case histories are described for verification. Subject: rock engineering in hazardous geo-environments Keywords: case studies; problem rocks; risks and hazards 1...
Proceedings Papers
Paper presented at the 12th ISRM Congress, October 16–21, 2011
Paper Number: ISRM-12CONGRESS-2011-307
... prediction of squeezing conditions in rock tunnels based on case-histories in tunnels under high stresses. The methodology is based on the use of a linear classifier for statistical analysis of a database of well-documented case histories compiled from the literature. Results show that rock quality...
Proceedings Papers
Paper presented at the 12th ISRM Congress, October 16–21, 2011
Paper Number: ISRM-12CONGRESS-2011-305
... Caminos, C. y P., Technical University of Madrid, Spain ABSTRACT: This paper presents the application of an empirical equation for modeling the evolution of convergences (both as a function of time and distance to the face) in rock tunnels. To that end, convergence data from several case histories...
Proceedings Papers
Paper presented at the 10th ISRM Congress, September 8–12, 2003
Paper Number: ISRM-10CONGRESS-2003-028
... stability. Stress Relaxation with Open Pit Mining Open pit highwalls undergo unloading during the mining process. instability mechanism stability performance stress relaxation highwall stability performance strain level pit highwall data mining metals & mining Case History highwall...
Proceedings Papers
Paper presented at the 9th ISRM Congress, August 25–28, 1999
Paper Number: ISRM-9CONGRESS-1999-299
... the water quality of the middle and lower reaches of the river during the dry season and create favorable conditions for the South-to-North Water Transfer. time effect dam section knowledge management reinforcement Case History operation dam heel dam site excavation construction flood...
Proceedings Papers
Paper presented at the 7th ISRM Congress, September 16–20, 1991
Paper Number: ISRM-7CONGRESS-1991-216
... and construction, we can take the case history of Lubuge Project as an example. 2. CASE HISTORY OF THE LUBUGE HYDRO-PROJECT The Lubuge project located in Yunnan Province with an installed capacity of 600 MW is considered as a "window" opened to the outside world in Chinese hydro-engineering. The main features...
Proceedings Papers
Paper presented at the 4th ISRM Congress, September 2–8, 1979
Paper Number: ISRM-4CONGRESS-1979-080
... slopes provided guidance for design. Fig. 1 shows the schistose phase of the ashrock, and Fig. 2 the altered phase. Table 1 shows some of the information on previous slopes that was used in the wall design. schistose phase Case History open pit knowledge management metals & mining...
Proceedings Papers
Paper presented at the 4th ISRM Congress, September 2–8, 1979
Paper Number: ISRM-4CONGRESS-1979-117
... not be overlooked. Progress can only be maintained if empirical approaches are backed by analytical studies. Artificial Intelligence drilling operation reservoir geomechanics classification Rock mass Rating discontinuity orientation geomechanics Classification Case History Rock Engineering...