Please enable JavaScript for this site to function properly.
OnePetro
  • Help
  • About us
  • Contact us
Menu
  • Home
  • Journals
  • Conferences
  • Log in / Register

Log in to your subscription

and
Advanced search Show search help
  • Full text
  • Author
  • Company/Institution
  • Publisher
  • Journal
  • Conference
Boolean operators
This OR that
This AND that
This NOT that
Must include "This" and "That"
This That
Must not include "That"
This -That
"This" is optional
This +That
Exact phrase "This That"
"This That"
Grouping
(this AND that) OR (that AND other)
Specifying fields
publisher:"Publisher Name"
author:(Smith OR Jones)

Do the Right Thing at Right Time KOC Way of Integrating Process Safety into Process Related Facility Projects

Authors
Mazharuddin Shaikh (Kuwait Oil Company) | Majed Al-Mutairi (Kuwait Oil Company) | Anwar Al-Wehaib (Kuwait Oil Company) | Sami Al-Enezi (Kuwait Oil Company)
DOI
https://doi.org/10.2118/198135-MS
Document ID
SPE-198135-MS
Publisher
Society of Petroleum Engineers
Source
SPE Kuwait Oil & Gas Show and Conference, 13-16 October, Mishref, Kuwait
Publication Date
2019
Document Type
Conference Paper
Language
English
ISBN
978-1-61399-674-4
Copyright
2019. Society of Petroleum Engineers
Keywords
process safety
Downloads
8 in the last 30 days
27 since 2007
Show more detail
View rights & permissions
SPE Member Price: USD 9.50
SPE Non-Member Price: USD 28.00
Abstract

Several major incidents that involved newly commissioned projects with a range of inherent weaknesses bear testimony to the need for building process safety systematically into future engineering projects. The proper integration of hazard and risk studies into a project is key to achieving full potential for safety. One of the main objectives of successfully integrating process safety into a project is to reduce this residual safety risk. This paper describes the best practice developed by Kuwait Oil Company for integrating process safety activities, especially performing PHA studies through out the life cycle of process related facility projects. This paper outlines types of projects at KOC, phases of projects, brief on project requirement at each phase, details on PHA, PHSER and PSSR reviews at each stage of process to adequately assess & manage the risk. The failure to integrate all of these means that processes and project may not achieve their full safe and efficient performance.

File Size  1 MBNumber of Pages   15

Other Resources

Looking for more? 

Some of the OnePetro partner societies have developed subject- specific wikis that may help.


 


PetroWiki was initially created from the seven volume  Petroleum Engineering Handbook (PEH) published by the  Society of Petroleum Engineers (SPE).








The SEG Wiki is a useful collection of information for working geophysicists, educators, and students in the field of geophysics. The initial content has been derived from : Robert E. Sheriff's Encyclopedic Dictionary of Applied Geophysics, fourth edition.

  • Home
  • Journals
  • Conferences
  • Copyright © SPE All rights reserved
  • About us
  • Contact us
  • Help
  • Terms of use
  • Publishers
  • Content Coverage
  • Privacy
  Administration log in