1-6 of 6
Keywords: installation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-075
...UTI '97 O SUT 1997 THE STATOIL DEEPWATER PIPELINE REPAIR SYSTEM. DAVID NORMAN Technical Manager, Subsea Offshore Ltd.. Greenwell Road Aberdeen ABSTRACT This paper describes a Diverless System for deepwater pipeline installation and repair called the 'Statoil Installation System for Diverless...
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-103
... the production line and the subsea structure, especially when the use of ngid lme terminating ulth a spoolpiece is envisaged The installation and connecbon of a ngid spoolpiece, being an almost state of the art operation ulth diver assistance, has almost no track record where diverless operation is concerned...
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-119
... to the preferred use of subsea production manifolds that combine the output from several wells and therefore reduce the number of export flexible flowlines required Two such marufolds have been recently installed in the ALBACORA field TYPICAL CONVENTIONAL MANIFOLD DESCRIPTION Typical subsea production mamfolds...
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-155
...UTI '97 O SUT 1997 THE REMOTE INSTALLATION OF PIPELINE BUNDLES IAN EDWARDS Rockwater Lirmted Stoneywood Park Stoneywood Road Dyce, Aberdeen, A3321 7DZ Scotland ABSTRACT The paper reports recent advances in the installation of pipeline bundles using diverless and ROV-less techques The paper details...
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-177
... to protect workers who operate in close proximity to nuclear installations UTI '97 O SUT 1997 The current "normal dose limit" for a "radiation worker" is Srad in a year or 2 Smrad/h for 2000h These figures apply to "whole body exposure", localised irradiation of say the hands could be higher On any nuclear...
Proceedings Papers

Paper presented at the Underwater Technology International: Remote Intervention, April 8–10, 1997
Paper Number: SUT-UTI-97-275
... of installation include Guidewre installation Component installation and replacement Template/wellhead workover - valve operation and emergency ovemde - valve maintenance and testing - isolation of wellhead control and chemical injection systems Riser installation and inspection Umbilical and flowline...

Product(s) added to cart

Close Modal