1-5 of 5
Keywords: connector
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Subsea International '93, April 28–29, 1993
Paper Number: SUT-AUTOE-v30-069
... their reliability. Among recommendations made in that report was the need for improvements in overload protection to prevent expensive damage caused by trawler and ship anchor snagging. This report documents the development of a new generation of ‘weak link’ connector, its use in current and future subsea systems...
Proceedings Papers

Paper presented at the Subsea International '93, April 28–29, 1993
Paper Number: SUT-AUTOE-v30-093
... flowmeter connector allocation pig launcher upstream oil & gas accuracy reservoir surveillance pipeline platform psm diver separator production monitoring flow metering isolation valve production control control module pipework drillstem testing drillstem/well testing subsea system...
Proceedings Papers

Paper presented at the Second Generation Subsea Production Systems: Proceedings of an International Conference (Subsea International '89), December 31, 1989
Paper Number: SUT-AUTOE-v20-105
..., this fixes the wellhead and tubing hanger design Thereafter the following items are addressed: wellhead connector; a christmas tree; a flowline system; a control system; a workover system; a intervention (maintenance) system satellite well system control valve manufacturer...
Proceedings Papers

Paper presented at the Second Generation Subsea Production Systems: Proceedings of an International Conference (Subsea International '89), December 31, 1989
Paper Number: SUT-AUTOE-v20-203
... Christmas tree is assured by remotely operated subsea electrical and hydraulic connectors. Following exhaustive dry tests, a control system prototype was installed in the Agip Luna Field (Ionian Sea, Mediterranean) for long-term sea trials The project demonstrated that an autonomous control system...
Proceedings Papers

Paper presented at the Second Generation Subsea Production Systems: Proceedings of an International Conference (Subsea International '89), December 31, 1989
Paper Number: SUT-AUTOE-v20-217
... and management installation vehicle disp development valve connector water depth upstream oil & gas template DISPS Development and Testing N. Rodda, BP Exploration, UK 1. INTRODUCTION The objectives and concepts behlnd BP Exploration's DISPS Project have been given elsewhere 1.2.3.4 DISPS...

Product(s) added to cart

Close Modal