Paper presented at the Subsea Control and Data Acquisition (SCADA) Conference, June 2–3, 2010
Paper Number: SUT-SCADA-10-05
..., all-electric operated, subsea gas compression installation to be successful. The development has faced numerous technical issues (which have now been solved), and extensive testing for qualifying the components and complete as- semblies has been undertaken. Since there are no standards that cover this...
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition (SCADA) Conference, June 2–3, 2010
Paper Number: SUT-SCADA-10-107
... projected well beyond the original design life of the installed system. Existing facilities are being used more and more for marginal field tiebacks and natural extensions to maximise the economic benefit of these facilities, which can only be realised in a number of cases by the introduction of modern...
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition (SCADA) Conference, June 2–3, 2010
Paper Number: SUT-SCADA-10-127
... installation subsea production equipment ABSTRACT This paper presents an overview of the events leading to the establishment of a joint industry project (JIP) to address blockages in hydraulic control and chemical injection fluid conduits in subsea production systems (SPSs) and details its findings...
Proceedings Papers

Paper presented at the Subsea Controls and Data Acquisition 2002, June 13–14, 2002
Paper Number: SUT-SCADA-02-123
... commercial installation was in '97, but the advantages are rapidly becoming clearer as the number of installations increase. Optical fibre has many advantages over the conventional copper-based solutions, such as 1,000-fold increase in bandwidth and reduction in error rate and inherent electrical noise...
Proceedings Papers

Paper presented at the Subsea Controls and Data Acquisition '98: Cost effective challenges for a geographically expanding industry, April 22–23, 1998
Paper Number: SUT-SCADA-98-207
... installed, the previously sequential hydraulic system is easily replaced, using the same interfaces, by the TOV electrohydraulic control, where conventional pod would have needed an additional structure Though first installed in the shallow waters of Argentina, the TOV system is optimally designed for...
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition: Proceedings of an international conference, April 20–21, 1994
Paper Number: SUT-AUTOE-v32-003
... control system, implementing some advanced technologies such as very high pressure hydraulic components (760 barg) and specific ROV tooling The subsea system is designed for initial installation using a combination of diver and diverless techniques Diverless intervention is feasible in connection with...
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition: Proceedings of an international conference, April 20–21, 1994
Paper Number: SUT-AUTOE-v32-211
... units were adapted for long term installation and were fitted with low permeability bladders to reduce loss of nitrogen gas to a minimum, stainless steel fluid port assembly, metal to metal sealed gas valve assembly with grease filled protective cap and the unit finished with a special paint system...
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition: Proceedings of an international conference, April 4–5, 1990
Paper Number: SUT-AUTOE-v22-047
... subsea systems assoc~ated wth the production of oil or gas Examples are in wellhead control systems and seabed- installed pressure-boostlng stahons A w ~ d e choice of connector types 1s available The pnnc~ples of operation on which they are based are conduchve, lnduct~ve or capacihve coupling The last...