1-2 of 2
Keywords: drillstem testing
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Subsea Control and Data Acquisition (SCADA) Conference, June 2–3, 2010
Paper Number: SUT-SCADA-10-169
... protection system scada drillstem testing bypass valve upstream oil & gas hipp logic solver measurement and control sil pressure sensor safety instrumented system subsea system requirement iec 61511 shut-in pressure valve 169 Abstract Subsea high integrity pressure protection system...
Proceedings Papers

Paper presented at the Subsea Controls and Data Acquisition '98: Cost effective challenges for a geographically expanding industry, April 22–23, 1998
Paper Number: SUT-SCADA-98-073
... subsea production equipment drillstem testing control valve operation deepwater workover control system sut 1998 subsea control interlock requirement acoustic backup system control module upstream oil & gas control panel nser system response time vessel installation control system...

Product(s) added to cart

Close Modal