Paper presented at the Aspect '96: Advances in Subsea Pipeline Engineering and Technology, November 27–28, 1996
Paper Number: SUT-ASPECT-96-025
... installed and started monitoring the second half of 1994. This paper describes the principles of FSM, typical subsea applications and various options of system solutions. Examples of experience from field installations are presented, and technical solutions and advantages of FSM subsea discussed. A new...
Proceedings Papers

Paper presented at the Aspect '96: Advances in Subsea Pipeline Engineering and Technology, November 27–28, 1996
Paper Number: SUT-ASPECT-96-135
... the traditional STress Based Design (STBD) criteria advocated by international codes. SNBD was adopted to make provision for the limit capacity of available laying equipment in difficult installation conditions, to minimize seabed preparation and free span correction works for pipelines crossing uneven seabeds...
Proceedings Papers

Paper presented at the Aspect '96: Advances in Subsea Pipeline Engineering and Technology, November 27–28, 1996
Paper Number: SUT-ASPECT-96-195
... of plastic pipes suitable for hydrocarbon service called "Sealine" In 1995 Stewarts & Lloyds Plastics (as ~t then was) contracted ABB Lurnrnus Global (ABBLGL) to undertake a study investigating a number of offshore engineering considerations such as installation techniques and operational constraints...
Proceedings Papers

Paper presented at the Aspect '96: Advances in Subsea Pipeline Engineering and Technology, November 27–28, 1996
Paper Number: SUT-ASPECT-96-233
... for the application, simplifying the installation method, avoiding pipeline maintenance and minimizing the requirement for inspection of the pipeline Plastic pipe was chosen as the preferred material because it was relatively cheap, was readily available, it had suitable properties when used In a marine environment...
Proceedings Papers

Paper presented at the Advances in Subsea Pipeline Engineering and Technology: Proceedings of ASPECT '90, May 30–31, 1990
Paper Number: SUT-AUTOE-v24-003
... u r i n g ~ n s t a l l a t i o n , i t c o u l d reduce t h e o p e r a t ~ n g compressive s t r e s s t o a l e v e l below t h e minimum b u c k l i n g s t ress . P r e s t r e s s ~ n g t h e f l o w l i n e has t h e same e f f e c t as r a i s i n a the installation temperature and thereby...
Proceedings Papers

Paper presented at the Advances in Subsea Pipeline Engineering and Technology: Proceedings of ASPECT '90, May 30–31, 1990
Paper Number: SUT-AUTOE-v24-249
... PROJECT SUMMARY The Brae field, discovered in 1975, is located In block 16/7 about 42 nautical miles north west of the Occidental Piper field and 70 nautical miles of the BP Forties field The Brae ‘A’ platform was installed in 1982. First oil was exported in July 1983 and production rates...
Proceedings Papers

Paper presented at the Advances in Subsea Pipeline Engineering and Technology: Proceedings of ASPECT '90, May 30–31, 1990
Paper Number: SUT-AUTOE-v24-301
... INTRODUCTION In 1988 ACEL, the municipal gas company of the town of Lecco, commissioned a turnkey project involving the installation of three gas lines respectively 2.2, 3.9 and 4 7 Km in length, connecting the towns of Olcio, Dervio, Bellano and Varenna on the left shore of the lake...