Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: wellbore integrity
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Abandonment Best Practices in Unitised Area for Wells and Facilities Straddling Two Countries in Malay Basin: A Case Study
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208467-MS
... Wellbore integrity Wellbore integrity is one of the important factors and it needs to be given highest priority when it comes to permanent well abandonment. Performing the isolation at caprock level or reservoir level without understanding the cement behind the casing will be a recipe for disaster...
Proceedings Papers
Evaluation of an Ultra-High Performance Epoxy Resin Sealant for Wellbore Integrity Applications
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2019
Paper Number: SPE-199184-MS
... and penetrability even in small gaps, ability to resist differential pressure higher 1000 psi, and extremely high compressive strength. This work demonstrates that epoxy resin sealant can be used effectively and safely in sealing cement voids. Wellbore Design resin operation wellbore integrity Upstream...
Proceedings Papers
Plug and Abandonment Procedures for Onshore Wells and the Utilization of Reserved Abandonment and Site Restoration ASR Funds
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193956-MS
... in the future, have wellbore integrity problems, exposed to vandalism and risks for the safety of operations and the environment are taken into consideration to secure the well by plugging and abandoning or P&A. New Regulations The improvement of regulations regarding ASR is marked by the issuance...
Proceedings Papers
Cap Rock Restoration in Well Abandonment: Fit-for-Purpose Well Abandonment Design through Workflow Optimization and Integrated Assessment
Available to PurchaseJing Zhi Kueh, Hamed Hassani, Mohd Dzulfahmi B Zamzuri, Ahamd Luqman B Johan, M Zakwan B Zainal Abidin, Khomeini B Abdussalam, Zainuddin B Yusop, M Anas B A Razak
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193965-MS
... assessment from reginal geology till wellbore integrity and operational doability to address both technical and operational concerns within comprehensive risk assessment prior to execution. Cap Rock Restoration Cap rock identification is most crucial step in well abandonment proposal maturation...
Proceedings Papers
The Optimization for Cost-Effective Well Plug and Abandonment Techniques
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193987-MS
..., this optimization has saved US$2 million. wellbore integrity well decommissioning casing and cementing abandonment technique Wellbore Design government Indonesia budget Upstream Oil & Gas Central Sumatra Basin permission cost estimation and control isolation optimization standard requirement...