Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: barge
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Challengeable Engineering Design of a Deck for Coiled Tubing Well Abandonment on a Dynamic Positioning Barge
Available to PurchaseEsmaeil Bahrami, Mahbod Seyednia, Ali Akbar Mosallaie Barzoki, Alireza Zangenehvar, Seyedebrahim Rabbani
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2019
Paper Number: SPE-199181-MS
... and wells to their original state. The crucial stages after the accident were killing a perforated well, wreck removal and cutting the wells below the section they had been bent or distorted and finally the wells abandonment by cementing coiled tubing operation on a dynamic positioning barge. This paper...
Proceedings Papers
Innovative Rigless Well Intervention on Collided Platform Using New Designed Extended Deck on a Dynamic Positioning Barge
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193954-MS
... on cement for the upper plug to cure. 3- RIH to the TOC depth of upper plug, tagging and verification of the TOC and POOH. New Concept Multi-Purpose Barge for Salvage Operation After abandonment of well No. 5 using the stimulation vessel, the remained operation performed using a multi-purpose work...
Proceedings Papers
Crane-Less, Diver-Less Platform Decommissioning Vessel to Reduce Cost and Enhance Safety and Efficiency
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193976-MS
... complete topsides, complete jacket or reduced number of jacket lifts, subsea pipeline, pipe and flexibles, mattresses and other subsea infrastructure within vessel lift capability. subsea system barge Reduce Cost cassette topsides Upstream Oil & Gas infrastructure Efficiency operation...
Proceedings Papers
Converted Barge for Wellhead Platform Decommissioning
Available to PurchaseDen Yimtae, Manit Aimcharoenchaiyakul, Sarayut Uiyyasathian, Maythus Svasti-xuto, Chatawut Chanvanichskul
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193981-MS
... Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge shall have capability to self-decommissioning topside and jacket and transportation to disposal premises. The key advantage...