Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: Efficiency
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Reducing ABEX Uncertainties through Hybrid LSTK Contracting: A Factory EPSm Pilot Case Study in South East Asia
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208621-MS
...Project Management and Front-End Wells Engineering The project management team and front-end wells engineering team is accountable for the safe, cost efficient and compliant delivery of the project and includes: ▪ Project Owner ▪ Project Manager and Technical Director ▪...
Proceedings Papers
Implementation of a New Methodology for Efficient Well Abandonment Operations
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2019
Paper Number: SPE-199198-MS
... efficiency by reducing the quantity of cement plugs deployed while obtaining better placement success. The methodology, a "pump and pull" technique, has enabled successful plug placements range from a 1,650-foot plug set in a highly deviated well to a 1,950-foot plug set in a vertical well. Most...
Proceedings Papers
Crane-Less, Diver-Less Platform Decommissioning Vessel to Reduce Cost and Enhance Safety and Efficiency
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193976-MS
... require good weather, low wave height and swell and low wind speed. The presented alternative has far less weather demands. Reduce time (and thus cost) on site due to the capability of the proposed design. Enhance efficiency as design is suitable for all offshore infrastructure removal including...
Proceedings Papers
A Comparative Study: Rig v/s Rigless Abandonment in Western Indian Offshore
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193982-MS
... will tend to standardize and gain proficiency to develop a sustainable approach to well decommissioning. Upstream Oil & Gas Efficiency rigless abandonment economics comparative study constraint western offshore rig platform modification well decommissioning platform Offshore dry tree...