1-6 of 6
Keywords: Drilling Equipment
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208621-MS
... performance factors provide insights to areas where there are synergies and opportunities to further reduce risk and the total cost of ownership through an Engineering, Procurement, Services management (EPSm) contracting approach. strategic planning and management project management drilling equipment...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, November 30–December 2, 2021
Paper Number: SPE-208482-MS
... petroleum engineer drilling equipment upstream oil & gas procurement agility project management casing design casing and cementing intermediate reservoir pressure control equipment wellbore well control completion installation and operations annular pressure drilling engineering offline...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193966-MS
.... Completion Installation and Operations casing and cementing offshore process platform Drilling Equipment cutting operation abandonment casing design Upstream Oil & Gas hoisting personnel drilling operation Conductor integrity phase iii well abandonment experience multi-string cutting...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193938-MS
... operation drilling time analysis drillstring design drill pipe selection bridge plug casing design casing and cementing cutter Drilling Equipment Upstream Oil & Gas Well Design plug packer Efficiency Improvement Business Partner Wellbore Design well integrity drilling rig Gulf cement...
Proceedings Papers

Paper presented at the SPE Symposium: Decommissioning and Abandonment, December 3–4, 2018
Paper Number: SPE-193984-MS
... described. With five wells successfully completed, the key performance indicators (KPIs) are discussed, and project lessons learned are presented. casing design Drilling Equipment wellhead suspension system uk continental shelf well decommissioning casing and cementing abandonment mechanical...

Product(s) added to cart

Close Modal