1-20 of 35
Keywords: installation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192177-MS
... magnet motor application ims ESP application PMM rotor torque power factor installation Introduction ESP is a key, high rate artificial lift method. As shown in Figure 1 , the system is a complex electro-hydraulic system consisting of a centrifugal pump, a protector and an electric motor...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192433-MS
... and rated for high temperatures and high pressures, making it expensive and difficult to manufacture. The process of measurement and fabrication can only be initiated after the rig installs the X-mas tree in order to obtain as-built measurements. In order to optimize well tie-in, Saudi Aramco installed its...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192434-MS
...-flooding installation Modeling & Simulation society of petroleum engineers simulation result ior potential evaluation Statoil Oil Recovery npv economic analysis final manuscript Introduction Table 1 GOC and OWC in the different formations and segments in the Norne Field ( Statoil...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192287-MS
..., jet pumping technology was applied to offload the well. A jet pump was run in the well on tubing, which was equipped with a bottomhole assembly (BHA) for a downhole jet pump. It was installed in a free-style after opening the swab and master valve of the Christmas tree. Once, the jet pump properly...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192424-MS
... content, nearby oil and gas wells, the installation and dismantle process of the RTP line after completing the operation were faced and resolved during the implementation of this technology. Utilizing RTP during the testing period of the well saved the environment from unnecessary emissions of heat...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192205-MS
... downtime and the need to move a workover rig to the well site. A jet pump can be installed in a well using a variety of techniques, depending upon the well completion and can be customized easily depending upon downhole conditions. However, if one does not monitor the operation and working parameters...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192323-MS
... the well with very high frequency sampling both in terms of space and time. The paper will establish the basic understanding of distributed measurement principles. Then, it will cover the different installation methods based on the parameter of interest. The fiber deployment can occur during initial well...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 24–27, 2017
Paper Number: SPE-188020-MS
... Abstract Coiled Tubing deployed Electrical Submersible Pumps (ESPs) have had a very short history in the oil and gas industry. The idea of installing a pump using coiled tubing was developed more than a decade ago which would allow the possibility of rigless operations and reduce the time...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182761-MS
...Production Operations Production from the well commenced 3 months after installation. Each of the laterals were flowed back individually to ensure flow back of the completion brine and removal of any drilling mud. Once the lateral is cleaned up and start producing dry oil, the lateral...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182760-MS
... are incorporated to the sealing interface to facilitate a pressure test during installation. On the back side of the feedthrough, a metal to metal seal is established with the encapsulated cable by using a combination of a dual conic swage ferrule and a compression olive. A retaining ring is torqued to apply...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182730-MS
... to the other segments of the pipe's circumference. Abstract Chemical consumption and wash water usage has risen in the past few years due to oil production having increasing water cut and emulsions. Saudi Aramco has installed and tested a new chemical injection spool that enhances the mixture...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182814-MS
... circulation zone, and push the operating envelop by installing the first 4-1/2" open hole completion (Pre-perforated liner) with inflatable open hole isolation packers through a 5-1/2" × 7" open hole liner (OHL). The vendor product enabled Saudi Aramco to install 5-1/2" × 7" solid expandable liner...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Annual Technical Symposium and Exhibition, April 21–23, 2015
Paper Number: SPE-177988-MS
... and temperature ranges 1 . This paper will focus only on valve cavitation related damage, which happens on water choke valves. The main purpose of this paper is to demonstrate a trial installation of multistage choke valve technology in water lines that reduces high pressure drops across water injection choke...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Annual Technical Symposium and Exhibition, April 21–23, 2015
Paper Number: SPE-177990-MS
... equipment selection process, completion schematic and installation process. The paper will then discuss several challenges encountered during the ESP installation, precommissioning and commissioning, in addition to solutions implemented to overcome these challenges. Examples of the technical...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 21–24, 2014
Paper Number: SPE-172192-MS
... fields. The implementation involved installation of the VS on ten different Low Pressure (LP) gas wells to utilize the strong stream HP well(s) that were drilled recently or producing from a more prolific reservoir section. Recent field examples of this technology from Saudi Arabia are covered...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 21–24, 2014
Paper Number: SPE-172196-MS
... installation of the prototype. Close collaboration between the R&D team, Engineering Services and plant owners, under the supervision of strongly supportive management, was essential for rapid field deployment of prototype technology with unconfirmed impact on the production rate. The procedure...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, May 19–22, 2013
Paper Number: SPE-168093-MS
... The fourth workover was carried out on April 8, 2009, to replace the failed ESP. After installation of the new ESP, a function test was performed prior to the rig move. ESP commissioning was performed successfully on April 15, 2009. All the ESP parameters were within the normal operating...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 8–11, 2012
Paper Number: SPE-160841-MS
... lift injection rate through the 4" port in the 1" gas lift valve straddle pack off to be installed at 2,400 ft. This equated to a range of surface gas lift injection pressure from 1,600 to 1,970 psig. Orifice will be in critical flow. Anticipated well production: Oil Rate = 1,694 barrels of oil per...

Product(s) added to cart

Close Modal