1-16 of 16
Keywords: cement
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192360-MS
... Abstract Cement Evaluation Logs are generally used to evaluate the quality of the cement sheath behind the casing or liner before a well test or production operation is performed in the well. In many countries, regulatory authorities require that cement evaluation logs be done in every well...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192232-MS
...Introduction Abstract Well cementing is an important operation during drilling and completion of oil wells. The cement sheath must maintain well integrity behind the casing and provide long-term zonal isolation to ensure safety and prevent environmental problems. Some of the uses of cement...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 23–26, 2018
Paper Number: SPE-192342-MS
... Abstract Cement is a major material component in the construction and sealing of hydrocarbon wells. Well leakage through cement is a problem that increases maintenance costs and poses threats to surrounding communities and the environment. This study focuses on reducing gas leakage potential...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182841-MS
... well control annular pressure drilling Conductor mud line suspension well isolation cement diverter gas migration drilling operation North Safaniya liner cement slurry hydrostatic pressure Upstream Oil & Gas platform shallow gas formation loss circulation zone recommendation...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Annual Technical Symposium and Exhibition, April 21–23, 2015
Paper Number: SPE-177980-MS
... on the lower two zones to be able to determine commercial hydrocarbon gas rates. The first major challenge was for zonal isolation of the lowest zone, expected to be a highly fractured zone that might also be stimulated. A cement plug was designed to be deployed by means of coiled tubing (CT) for accurate...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 8–11, 2012
Paper Number: SPE-160853-MS
... to be temporarily or permanently isolated utilizing cast iron, composite or sand plugs capped with cement that must maintain integrity and be able to tolerate high differential pressure across the plug during hydraulically fracturing the upper zones. The subject paper is a review of the design philosophy, planning...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 8–11, 2012
Paper Number: SPE-160890-MS
... Several groups have conducted research in the lab to determine the effect of carbonic acid on well cements. Kutchko et al. (2007) , Duguid et al. (2006) , and Barlet-Gouedard et al. (2006) have recently examined the effects of exposure to carbonic acid on well cements under carbon capture...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 9–11, 2009
Paper Number: SPE-126050-MS
... of expandable casing clad to repair wells with casing leaks across the high-pressure zone. In such wells, the leak was located across Arab-C in production liner. Then, the leak was squeezed off with cement. After that, the casing window was milled below the leak and a short radius curve section was drilled...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 9–11, 2009
Paper Number: SPE-126151-MS
... dictated directionally drilling an extended-reach well with an 8-1/2-in. horizontal-hole section over 13,900 ft (4237 m) in length. It was apparent from the outset that directionally drilling the 8-1/2-in. section was going to be extremely challenging. Once drilled, running and cementing the 7-in. liner...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 9–11, 2009
Paper Number: SPE-126152-MS
... intrusion and improve recovery efficiency is proposed. This paper discusses the process to create the fracture barrier and the benefits of the completion methodology supported with extensive simulations for the different scenarios. hydraulic fracturing barrier fracture waterflooding cement...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 7–8, 2007
Paper Number: SPE-110968-MS
... 1/8" open hole at 10,600 ft at 88 ° and capping it with cement and gel using coiled tubing (CT). Historically, it has been difficult, if not possible, to perform mechanical water shut-off in open horizontal well, as inflatables are quite sensitive to be set in open hole. This paper shows...

Product(s) added to cart

Close Modal