1-5 of 5
Keywords: bit design
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182737-MS
... expensive drilling operations to show a greater reduction in cost per foot. cutter group 1 conclusion construction Upstream Oil & Gas group 2 field study structural integrity bit selection slim-body construction ROP slim-body matrix construction bit design drilling efficiency score...
Proceedings Papers

Paper presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, April 25–28, 2016
Paper Number: SPE-182739-MS
... Abstract Formation drillability is one of the most important aspects for planning and designing a new oil/gas well since the factors affecting the drilling performance have complex relationships between formation properties, drill bit design and operational parameters. In view of the high...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium and Exhibition, April 21–24, 2014
Paper Number: SPE-172169-MS
... to a new 26-in. hybrid bit design to overcome the drilling challenges and improve the overall drilling efficiency. The 26-in. hybrid bit technology with combined elements of PDC bits and tungsten carbide inserts (TCI) was deployed. This combination overcame the drilling challenges in this application...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 9–11, 2009
Paper Number: SPE-126057-MS
... hole quality or cleaning efficiency. spe 126057 Upstream Oil & Gas bit selection Bit Performance protection carbonate objective penetration rate bearing primary seal Roller Cone Bit Design Comp sparta program analysis bit design trial run application evolution society...
Proceedings Papers

Paper presented at the SPE Saudi Arabia Section Technical Symposium, May 10–12, 2008
Paper Number: SPE-120798-MS
... engineers and rig foremen coupled with an on-site bit design engineer. As a result of this teamwork, improvements were achieved in a short period of time, providing the confidence that the objective will be met. One of the primary objectives was to produce a drill bit that would provide the highest rate...

Product(s) added to cart

Close Modal