1-13 of 13
Keywords: assembly
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Rocky Mountain Petroleum Technology Conference, May 21–23, 2001
Paper Number: SPE-71052-MS
... recompletion spe 71052 assembly drilling operation coal seam gas coalbed methane gas well coalbed methane fruitland formation complex reservoir sidetrack coal bed methane formation coalbed methane gas well Copyright 2001, Society of Petroleum Engineers Inc. This paper was prepared...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 15–18, 1999
Paper Number: SPE-55618-MS
... operation assembly debris completion operator inner sleeve spe 55618 production enhancement directional drilling horizontal openhole completion downhole intervention completion installation and operations ecp impact hammer hydraulic pressure surface choke Copyright 1999, Society...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional/Low-Permeability Reservoirs Symposium, April 5–8, 1998
Paper Number: SPE-39942-MS
... of more recent horizontal drilling efforts in the Field is provided as well. P. 349 spe 39942 hole section nugget completion epru 41-18ah application mud system gas cap tvd drilling assembly liner procedure fresh water drilling operation east painter field directional drilling east...
Proceedings Papers

Paper presented at the Low Permeability Reservoirs Symposium, April 26–28, 1993
Paper Number: SPE-25864-MS
... the reservoir in as much detail as possible. P. 261^ slug test reservoir property pressure transient testing drillstem/well testing permeability packer reservoir pressure drillstem testing nitrogen slug test stress test assembly upstream oil & gas bridge plug history procedure...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 18–21, 1992
Paper Number: SPE-24382-MS
... in the Piceance Basin of western Colorado. P. 631^ assembly inclination colorado sidetrack mud weight test well upstream oil & gas early testing slant hole case study drilling operation fracture azimuth spe 24382 heavy weight drillpipe gas recovery research drillpipe plug...
Proceedings Papers

Paper presented at the Low Permeability Reservoirs Symposium, April 15–17, 1991
Paper Number: SPE-21866-MS
... assembly penetration rate natural fracture SPE SPE 21866 Slant-Hole Completion Test in the Piceance Basin, Colorado F.R. Myal, CER Corp., and K-H. Frohne, U.S. DOE SPE Members This paper was prepared for presentation at the Rocky Mountain Regional Meeting and Low-Permeability Reservoirs Symposium held...
Proceedings Papers

Paper presented at the Low Permeability Reservoirs Symposium, April 15–17, 1991
Paper Number: SPE-21836-MS
... assembly society of petroleum engineers spe 21836 pancanadian petroleum ltd foam texas wellbore drilling operation cable halliburton head assembly circulation horizontal well SPE Society of PetroIelm Engineers SPE 21836 Logging and Perforating of Horizontal Wells: An Innovative Approach D.J...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 11–13, 1988
Paper Number: SPE-17527-MS
... [30.5 m]) tools were utilized to drill the curved portion of the wellbore. A total of 534 ft (162.8 m) of lateral hole was drilled with a steerable bottomhole assembly. The amount of open productive interval was a five-fold increase over the vertical completion originally performed in the Ryckman Creek...
Proceedings Papers

Paper presented at the SPE/DOE Joint Symposium on Low Permeability Reservoirs, May 18–19, 1987
Paper Number: SPE-16409-MS
... perpendicular to the face cleat direction, thereby providing maximum access to primary flow channels. P. 195^ stability drainhole horizontal drainhole drilling guide directional drilling drilling operation assembly horizontal borehole upstream oil & gas coal seam perpendicular...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 22–25, 1983
Paper Number: SPE-11853-MS
... from the pump intake up, but offers no protection to the seal and motor. In an effort to protect the entire pump assembly, Chevron U.S.A. Inc. (CUSA) banded a string of 3/4" continuous coil tubing to the outside of the production tubing along with the power cable so that chemicals could be injected...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 22–25, 1983
Paper Number: SPE-11841-MS
... vector upstream oil & gas latitude trajectory design azimuth assembly rate gyro coordinate system accelerometer borehole azimuth gyro system axis spin axis configuration gyro output inclination computer well planning accuracy amplitude sensor gyro input axis SPE...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, May 11–12, 1976
Paper Number: SPE-5897-MS
... to reach the desired target. Experience has shown that many hours of rig time are used in making correction runs with different bottom-hole assemblies in order to stay on the predetermined course. Directional Drilling drilling time analysis information trajectory design drill pipe mud motor...
Proceedings Papers

Paper presented at the SPE Rocky Mountain Regional Meeting, June 2–4, 1971
Paper Number: SPE-3349-MS
... in effluent water clarification. Upstream Oil & Gas disperser water management rotor speed mechanism drilling fluid management & disposal Discharge Depurator drilling fluids and materials depurator system WEMCO Depurator System retention time Fagergren assembly standpipe Oil...

Product(s) added to cart

Close Modal