The formation of paraffin downhole or in surface equipment can significantly reduce or stop production. During winter months, when paraffin problems are at their worst, many paraffin chemicals are difficult to apply due to their high pour points. A method of squeezing paraffin inhibitor into the producing formation so that it will feed back over a long period of time may provide an effective solution to this problem.

You can access this article if you purchase or spend a download.