Abstract
Fracturing of horizontal wells is responsible for increasing rates and reserves from many reservoirs. Determining the optimum number of treatments, spacing, and eventual completion efficiency is critical to the success of a horizontal well development. This paper details the production analysis techniques required to evaluate the completion efficiency of multiply-fractured horizontal wells. Analytically modeled responses will be compared with actual horizontal well data to verify the technique.
Copyright 2009, Society of Petroleum Engineers
You can access this article if you purchase or spend a download.