1-20 of 23
Keywords: completion installation and operations
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, May 15–17, 2001
Paper Number: SPE-70004-MS
... weight fluid well integrity zonal isolation spe 70004 plug lower zone upstream oil & gas composite-bridge-plug technology monobore formation damage control wellbore cbp coiled tubing completion installation and operations composite bridge plug bridge plug Copyright 2001, Society...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, May 15–17, 2001
Paper Number: SPE-70031-MS
... in the next sections. tool string jerry foster log analysis spe 70031 upstream oil & gas production control reservoir surveillance slickline-deployed electromechanical intervention system slickline service intervention system production monitoring completion installation and operations...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 21–23, 2000
Paper Number: SPE-59534-MS
... 59534 indexing tool completion installation and operations nozzle buildup material SPE 59534 A Coiled Tubing-Deployed Slow-Rotating Jet Cleaning Tool Enhances Cleaning and Allows Jet Cutting of Tubulars Mike Connell, SPE, Perry Courville, and James Tucker, SPE, Halliburton Energy Services, Inc...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 21–23, 2000
Paper Number: SPE-59710-MS
.... Pressure readings are corrected by means of a tool internal Platinum RTD for accuracy. artificial intelligence collar locator micro-smart system safety parameter upstream oil & gas completion installation and operations innovation well condition flowmeter correlation stephen arnold...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 23–26, 1998
Paper Number: SPE-39779-MS
... hydraulic fracturing case 1 prosceno completion installation and operations perforated interval san andre zone propellant perforation society of petroleum engineers fracture spe 39779 Copyright 1998, Society of Petroleum Engineers, Inc. This paper was prepared for presentation at the 1998 SPE...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 27–29, 1996
Paper Number: SPE-35219-MS
... increase the time of the breakthrough. bottom water cone height potential distribution point source initial wac reservoir vertical well oil reservoir completion installation and operations drillstem/well testing drillstem testing transient flow reservoir simulation strength...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 27–29, 1996
Paper Number: SPE-35194-MS
... fracturing fet friction restriction upstream oil & gas water-hammer effect closure perforation friction friction component fracture spe 35194 near-wellbore restriction multiple fracture pump-in shutdown test key completion installation and operations net pressure fracture treatment SPE...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 27–29, 1996
Paper Number: SPE-35235-MS
... logging running casing cementing perforating stimulating running tubing installing wellhead installing facilities including artificial lift service company upstream oil & gas lower zone stimulation acid cost propel shallow gas program completion installation...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 27–29, 1996
Paper Number: SPE-35229-MS
... stored forces, the sealing element of the packer is often damaged as it travels inside the casing. This is especially true in wells that experience multiple reversals. pressure change zonal isolation shear mechanism seal assembly upper packer completion installation and operations packer...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 27–29, 1996
Paper Number: SPE-35236-MS
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 16–18, 1994
Paper Number: SPE-27654-MS
.... A description of the applications and requirements of the window cutting system is provided, along with bench test and field test results. milling assembly rotation packer coiled tubing operations coiled-tubing window completion installation and operations whipstock system spe 27654 torque...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 18–20, 1992
Paper Number: SPE-24000-MS
... injection pressure log analysis well logging differential pressure flow rate completion equipment pressure differential completion installation and operations safety valve formation pressure SPE Society of PetroIeun EngineerS SPE 24000 Injection Safety Valve Solutions for C02 WAG Cycle Wells W.S...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 18–20, 1992
Paper Number: SPE-23981-MS
... support completion installation and operations procedure ppf penetration SPE 23981 Collar Load Support (CLS) Tubing Running Procedure D.F. Boutwell, Frank's Casing Crew & Rental Tools Inc.; M.E. Gonzalez, Consultant; and M.D. Murrey, Exxon Co. U.S.A. SPE Members Copyright 1992, Society of Petroleum...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 10–11, 1988
Paper Number: SPE-17294-MS
... an adequate seal between the packer and tubing, between the packer mandrel and the packer body, as well as between the on-off tool and packer body. P. 243^ plastic coating upstream oil & gas completion installation and operations corrosion management subsurface corrosion injection equipment...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 13–15, 1986
Paper Number: SPE-15015-MS
... oil & gas major stimulation treatment completion installation and operations ppb breakdown control valve valve SPE Society of Petroleum Engineers SPE 15015 Perforation Breakdown Improves Permian Basin Stimulation Results by T.A. Scott, Halliburton Services Copyright 1986, Society...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 13–15, 1986
Paper Number: SPE-15029-MS
... completion installation and operations permeability reduction diameter perforation well productivity perforation depth perforation diameter twenty-four shot gun standoff perforation density permeability reduction upstream oil & gas wellbore perforation length productivity 1986...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 8–9, 1984
Paper Number: SPE-12603-MS
... fracturing technology illustrates that most fractures created are vertical, or near vertical, at most producing horizons. P. 233 strength cement slurry completion installation and operations drilling fluid property cement sheath dehydration application sub-fracturing pressure high squeeze...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 12–13, 1981
Paper Number: SPE-9709-MS
... in hydrocarbons and acid. P. 101 shear valve upstream oil & gas cement zone isolation isolation valve inflation cement top plug completion installation and operations completion system eliminate remedial squeeze the packers valve collar wellbore integrity casing and cementing packer...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 12–13, 1981
Paper Number: SPE-9718-MS
... and planning development option completion installation and operations asset and portfolio management restriction delineation well reservoir surveillance production monitoring well intervention planning study permanent artificial lift workover flow restriction upstream oil & gas recovery...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 10–11, 1977
Paper Number: SPE-6379-MS
... fracturing cement gelled water stimulation Completion Installation and Operations pay section information acid fracture porosity operator reservoir formation damage Canyon Sand Texas tight reservoir current completion practice spe 6379 Drilling Austin Chalk Society of Petroleum...

Product(s) added to cart

Close Modal