1-5 of 5
Keywords: programme
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17657-MS
... programme with KCl/polymer muds. Two appraisal and three development wells with planned deviation angles ranging from 45 to 58 deg. were selected. The trial was carried out in the 12 1/4" and 8 1/2" hole sections. The objections of the trial were to eliminate drilling, evaluation and production problems...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17696-MS
.... Whilst the programme and procedures stated in this paper are generally applicable throughout the Shell Group the references to Shell should be construed in this context as being relevant to SSB/SSPC activities only. Shell has always been conscious of the need for improved safety and reduction...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10430-MS
... The Philippines, by the end of 1980, has attained 446 MW of installed geothermal power generating capacity. This ranks second, after the United States, among countries g geothermal energy for power generation. In the 5-year (1981–1985) national energy development programme, it is envisaged...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10431-MS
... potential geothermal potential geothermal reservoir new zealand programme drilling indonesia geothermal energy Offshore South East Asia 82 Conference 9. 12 February, Singapore GEOTHERMAL SESSION The Geothennal Potential Of Indonesia <:It 10 Jl.a 1 by K E Seal, Geothermal Energy of New Zealand l.Jd...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10445-MS
... The paper describes the history of the work at Kamojang from the start of the original investigations in 1971, through the exploratory drilling phase, preparation of the feasibility study, the production drilling phase, preparation of the feasibility study, the production drilling programme from...

Product(s) added to cart

Close Modal