1-20 of 20
Keywords: procedure
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17665-MS
... & gas leak workover manufacturer laboratory testing wellhead seal packer fluid procedure SfJf 7th Offshore South East .Asia OSEA 88165 Conference, Singapore 2-5 February 1988 High Temperature High Rate Gas Well Completions: A Learning Experience by H. Husain and D. Steel, Mobil Oil Indonesia...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17672-MS
... penetration completion installation and operations evaluation flow performance ellipsoid linear perforation api rp 43 perforation upstream oil & gas permeability perforation core cfe flow rate clean perforation flow geometry flow efficiency procedure tunnel perforation...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17697-MS
... Abstract In July 1986 PETRONAS approved establishment of a Corporate Safety Group with responsibilities for: Initiating development of safety policies, procedures and guidelines. Implementing and monitoring same. Acting as official spokesman and liaison with Public and Third Parties...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17704-MS
... 24-inch pipeline gas flowrate operation finger slugcatcher liquid holdup flow diagram procedure handling holdup slugcatcher wellhead platform ogt cpp pipeline pigging 30-inch pipeline condensate flowrate upstream oil & gas quantity platform pipeline hairpin loop OSEA...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17696-MS
.... Whilst the programme and procedures stated in this paper are generally applicable throughout the Shell Group the references to Shell should be construed in this context as being relevant to SSB/SSPC activities only. Shell has always been conscious of the need for improved safety and reduction...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, January 28–31, 1986
Paper Number: SPE-14613-MS
... and project against which changes could be monitored and controlled. Comprehensive work package checklists were developed to establish the timing and control for key activities such as design, fabrication, decommissioning, salvage, installation procedure preparation and hook-up/ commissioning activities. Some...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12420-MS
... by proper corrections, in combination with the statistical uncertainty of the measurements. A standardized weighing procedure is described, underlining stable and reproducible loading conditions to get good statistical reliability. The state of the art in the best attainable measurement uncertainty is given...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12379-MS
... wells and production/test equipment. For example, it is normal procedure to periodically run perfor- mance tests on individual wells in conjunction with test separators and off- shore meter-proving units. Typical factors/data include: 3-46 * Temperature * Pressure * Maximum and Minimum Flow Rates...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12426-MS
... on the intensive testing and quality control program developed by Mobil Oil Indonesia, Inc to prevent similar future tubular failures. The Tubular Quality Control Program comprises manufacturing qua- lity control, third party inspections, and improved transportation and handling procedures. Since this program...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12454-MS
... asia session 14 annular pressure drilling casing and cementing hale sequence well control fresh water procedure drillpipe free water circulate cement slurry drilling fluid management & disposal circulation zone composition geothermal well brine pump pressure circulation...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12391-MS
... with international and industry standards. PETRONAS has issued several aperating procedures and guidelines governing certain aspects of its contractors operations. These procedures cover the areas of exploration, production, transportation, processing and export of oil and gas. In formulating the guidelines...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10419-MS
... procedures for storm disconnect require additional steps in technology. This step in technology is not great but it does require the incentive of the industry before equipment will be built and procedures established. Formation fracture gradients in very deep water present a major problem and only setting...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10434-MS
..., through buoyancy adjustment. There are two important factors involved upending procedures: the stability of the structure being upended, and the time-dependent change in the attitude of the structure. A computer program was developed to systematically analyze the stability of a structure being upended...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10429-MS
... wall drill pipe should be run in a property tapered drill string above the correct size drill collars. Proper breaker in procedures and make up torque should be used. Periodic inspection and maintenance, using the correct procedures, is essential. Hardbanding will help prevent wear on the tool joints...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10449-MS
... corrosion, etc. – corrosion control techniques such as inhibitors, coating, corrosion resistant steels, etc. – corrosion monitoring with special emphasis to procedures for thickness measurements The work is primarily based on experiences from design evaluation and inspection of equipment which...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10459-MS
..., Indonesia's National Oil Company initiated the development of test apparatus and test procedures to simulate actual downhole stresses on tubulars. Mobil's intention was to fill the gap in the published data and to determine the cause of thread leaks in Arun wells. It was postulated that the leaks were...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 26–29, 1980
Paper Number: SPE-8857-MS
... and reservoir performance, it is possible to specify the productivity and reservoir performance, it is possible to specify the optimal configuration for the entire system - and to assure the compatibility of the upstream and downstream elements. The analysis of the SPM system, a procedure for optimizing...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 26–29, 1980
Paper Number: SPE-8854-MS
... operations. specific gravity mechanical equipment procedure solid removal equipment drilling fluid management & disposal miscellaneous cost solid control low gravity solid solid control equipment Upstream Oil & Gas flow rate evaluation centrifuge drilling fluids and materials...
Proceedings Papers

Paper presented at the Offshore South East Asia Conference, February 21–23, 1978
Paper Number: SPE-7094-MS
... Tension Leg shallow water feet water depth procedure consideration deeper water loading installation sectionalized jacket construction self-floating jacket buoyancy Offshore South East Asia Conference .. 21-24 February 1978 Society of Petroleum Engineers Session /V7'1" Design...
Proceedings Papers

Paper presented at the Offshore South East Asia Conference, February 21–23, 1978
Paper Number: SPE-7103-MS
... with the Forties Field when BP planned to install a 32" line for a length of 165 km. in water depths of up to 130 mt. a project at that time unprecedented. BP decided to carry out lay trials in real scale to establish without reserves the feasibility of the project and also to define procedures and specific...

Product(s) added to cart