1-15 of 15
Keywords: pipeline
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17671-MS
... coast of Australia. The field is operated on behalf of the joint venturers by Woodside Offshore Petroleum Pty Ltd. Installation of the platform and trunkline was completed in 1982 and from this date all underwater work has been carried out by ROV. Typical work includes detailed pipeline and platform...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17704-MS
... Abstract The paper deals with the handling of liquids in the multi-phase flow pipeline system within Carigali's Duyong Offshore Gas Complex and the Onshore Gas Terminal, in Kerteh, Terengganu. The data and operations experience gathered necessitate changes to the operating procedures...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 2–5, 1988
Paper Number: SPE-17702-MS
... will be a combination of 139.7 mm in single wells and 88.9 mm in dual wells. Separate pipelines will be installed to transport the gas and condensate to shore. GEOLOGICAL DESCRIPTION EXPLORATION WELL HISTORY A total of six exploration wells were drilled at Jerneh to adequately delineate the field. Figure 2 shows...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, January 28–31, 1986
Paper Number: SPE-14622-MS
... Bomba, John G., R J Brown and Associates (Far East) Pte Ltd Abstract Pipeline transport of waxy crude oils can be performed effectively, both from technical and performed effectively, both from technical and economic standpoints, through adequate system designs. Such pipeline designs must...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12389-MS
... pipeline stabilization processing facility germ field pipeline separator petroleum engineer texaco denmark inc separation production facility upstream oil & gas gas monetization crude platform germ lng tyra field ngl development plan offshore 5th OfFsnor~ South East Asio SESSION 5...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12441-MS
... Abstract The retrofit of cathodic protection facilities to two offshore pipelines is described. The reasons for the premature failure of the initial system, and for the selection of the retrofit method are discussed. The design of the retrofit facilities, comprising sleds bearing 1.8 tonnes...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12446-MS
... Abstract In the early part of 1982 a leak detection survey on the 36 inch diameter 78 miles (126 km) long E11 submarine pipeline was carried out with optical and acoustical equipment during a period of 16 days. Two leaks were detected and identified as 0.5 inch (6 mm) cracks in two different...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12457-MS
... and downstream facilities is presented in the follo- wing sections. PART I: UPSTREAM FACILITIES . Tan Ek Kia SUMMARY The upstream facilities involve the recovery, conditioning and delivery of up to 90 MMscfd of associated gas frcm affshore Sabah to an onshore supply pipeline for a number of consumers...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12444-MS
... Khan, Saeed U.; R J Brown and Associates (Far East) Pte Ltd, Singapore Abstract The advances in offshore pipeline technology, in recent years, have been achieved by using innovative engineering to reduce construction risks and total capital costs. New design concepts and installation...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10446-MS
... drag reducer reduction performance midstream oil & gas flow rate pump station reduction pipeline concentration low concentration drag reducer performance operation upstream oil & gas production control production logging production monitoring reducer crude oil pipeline...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10478-MS
... schemes which a company can use to develop offshore oilfields are: Fixed platforms utilizing pipelines to transport oil to shore based storage. Movement of oil from storage to market would be by means of onshore pipelines, by a tanker loaded at a shoreside dock or by a tanker loaded at an offshore...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10447-MS
... The development of the Udang "B" project in the Indonesian Natuna Sea required the installation of two insulated submarine pipelines in nearly 300 feet of water. These pipelines carry 100 degrees F pourpoint crude, water, gas from the recently installed Udang "B" platform to the Udang...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10469-MS
... and injection for the intake, filtering, and pumping of230,000 barrels of sea water per day to a subsea pipeline. A 42 MWelectrical power generating station, fueled by natural gas from RAMA "B",providing power to facilities on the island, and to all offshorefacilities, be means of a network of submarine power...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10484-MS
... dehydration transmission condensate operation heat exchanger loading liquefaction process tanker storage tank scrub tower refrigerant preparation unit compressor refrigerant lng gas monetization midstream oil & gas lng plant tank liquified natural gas exchanger pipeline...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 26–29, 1980
Paper Number: SPE-8856-MS
..., is connected by a 400-foot bridge to a flare tripod. Production facilities capable of processing 40,000 barrels per day of high pourpoint crude are installed on the platform. Processed crude is pumped through dual insulated pipelines, platform. Processed crude is pumped through dual insulated pipelines...

Product(s) added to cart

Close Modal