Paper presented at the Offshore South East Asia Show, January 28–31, 1986
Paper Number: SPE-14613-MS
... of damaging the well conductors. It was appreciated at the conceptual design stage that early and significant involvement of Company Construction Engineers, crane barge Superintendents and diving specialists would be required for the identification and development of the salvage and installation procedures...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12419-MS
.... Since lifting operations are greatly affected by the motians a+ the derrick barge or the crane ship, it is necessary to evaluate the sling system in cansideratian of vessel motions in order to regulate lifting operations at the job site. This paper propases a static analysis method far designing sling...
Proceedings Papers

Paper presented at the Southeast Asia Show, February 21–24, 1984
Paper Number: SPE-12444-MS
... using the marine plows. p. 13–58 p. 13–58 offshore pipeline pipeline tow method cable installation upstream oil & gas availability post-trenching plow trench depth cost savings protection pipeline installation stability plow requirement installation cost barge...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10428-MS
...Offshore South East Asia 82 Conference 9 ~ 12 February. Singapore GENERAL SESSION Si''lJ04 2> Introduction Offshore LNG Production And Storage Systems by James K Barden. Conoeo Inc., U.S.A. A barge, outfitted with gas liquifaction processing equipment and LNG storage tanks, is suUested...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 9–12, 1982
Paper Number: SPE-10475-MS
... very large derrick barges, able to lift heavy modules present trend toward very large derrick barges, able to lift heavy modules weighing 2000 tons and above, in order to minimize the number of modules to be hooked up. Another trend is to take full advantage of that heavy modules concept and build...
Proceedings Papers

Paper presented at the Offshore South East Asia Show, February 26–29, 1980
Paper Number: SPE-8852-MS
... to 18 months to install. Production start-up timing is critical to the project economics. Upstream Oil & Gas separator evaluate marginal reservoir floating production system generator production barge FPSO platform Indonesia utility equipment reservoir flow station...
Proceedings Papers

Paper presented at the Offshore South East Asia Conference, February 21–23, 1978
Paper Number: SPE-7103-MS
... techniques to be adopted during the procedures and specific techniques to be adopted during the actual construction. Saipem was entrusted with these trials carried out offshore Gaeta during the second half of 1972 using the derrick/lay barge Castoro 2. The following operations were performed: – Laying...
Proceedings Papers

Paper presented at the Offshore South East Asia Conference, February 21–23, 1978
Paper Number: SPE-7094-MS
... and therefore more susceptible to stress amplification due to wave dynamics, which could be safely ignored in shallow water. This also increases the significance of fatigue assessment. subsea system Upstream Oil & Gas barge deep water platform water depth vertical attitude guyed tower pontoon...