In the early part of 1982 a leak detection survey on the 36 inch diameter 78 miles (126 km) long E11 submarine pipeline was carried cut with optical and acoustical equipment during a period of 16 days. Two leaks were detected and identified as 0.5 inch (6 mm) cracks in two different circumferential welds.

You can access this article if you purchase or spend a download.