... - valve positions, data trends, condition of pumps, wireline status, fuel, sand and water volumes and alerts. The nearby consultant gives me an affirmative nod as he calls out that stage 21 is nearing completion, and the transition to stage 22 will happen shortly. A frac engineer, glancing at the pump...
Proceedings Papers

Paper presented at the SPE Oklahoma City Oil and Gas Symposium, April 17–19, 2023
Paper Number: SPE-213098-MS
... PDP activities to another well, frac valves must operate reliably to ensure safe and effective operations. To operate frac valves, personnel must walk from the command center across the wellsite to the HPUs every time. This consumes valuable time, interrupting operations by 10–20 minutes...
Proceedings Papers

Paper presented at the SPE Oklahoma City Oil and Gas Symposium, April 17–19, 2023
Paper Number: SPE-213081-MS
... upstream oil & gas united states government shoetrack directional drilling casing design completion equipment complex reservoir wet shoetrack setting casing pressure rupture disk sub shoetrack tool valve toe sleeve wiper plug liner internal bypass sleeve casing and cementing...
Proceedings Papers

Paper presented at the SPE Oklahoma City Oil and Gas Symposium, March 27–31, 2017
Paper Number: SPE-185098-MS
... modeling gas injection depth water cut gravel pack current reservoir pressure artificial lift system gas lift gas Lift Design completion option incremental oil production permeability valve Introduction Due to increasing number of brown fields and lessening of huge oil discoveries...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 1–5, 2015
Paper Number: SPE-173605-MS
... equipment. Although sand flow is greatly reduced following an initial period of flow (30 to 60 days), the slugging nature of horizontal wells provides a significant risk for unexpected large quantities of sand to damage permanent separation equipment, surface piping and valves. Installing sand probes has...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 1–5, 2015
Paper Number: SPE-173614-MS
... string is directly related to difference in pressure across the plunger over the plunger area. Typical pump card loads plot near zero load when the traveling valve, TV, is open during the down stroke. When the standing valve, SV, is open during the upstroke the pump card loads should plot near fluid load...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 1–5, 2015
Paper Number: SPE-173623-MS
... plunger assembly slippage fluid conventional pump integral screen Pump Operation installation Upstream Oil & Gas plunger member new technology new sucker rod pump technology artificial lift system valve society of petroleum engineers clearance upstroke production fluid plunger...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 23–26, 2013
Paper Number: SPE-164475-MS
... Clearance Pockets (VVCP) or Fixed Volume Clearance Pockets (FVCP) that add clearance to the head end of a cylinder. Clearance can be added to the crank end of a cylinder by adding valve spacers under the valves. The running speed of the compressor and single acting the crank end or head end of a cylinder...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 27–29, 2011
Paper Number: SPE-141055-MS
... Abstract The tester set initial opening pressure of a gas-lift valve (GLV) and port size are no indication of its injection-gas passage at a given injection-gas pressure for unloading and/or gas lifting a well. The initial test rack opening pressure (P tro ) of a GLV creates an opening force...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 27–29, 2011
Paper Number: SPE-141251-MS
... intermittent gas lift bottomhole pressure artificial lift system upstream oil & gas intermittent gas lift system coiled tubing expansion gas injection liquid level liquid slug gas injection pressure plunger rise velocity static bottomhole pressure valve INTRODUCTION The arrival...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 27–29, 2011
Paper Number: SPE-142293-MS
... Settings In the example shown in Figure 1 , the approximate rate of 10 MMCFD at suction pressure of about 170 psig and 1400 RPM’s (Maximum Allowable) was found to be desirable. Temperature kills are required to protect compressor valves and to indicate valve failures. These kills must be set...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, April 4–8, 2009
Paper Number: SPE-120643-MS
... of the conditions existing on the surface, within the wellbore and within the reservoir. artificial lift system Drillstem Testing acoustic trace reflection production control Upstream Oil & Gas gas well gaseous liquid column Reservoir Surveillance liquid level critical rate perforation valve...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, April 4–8, 2009
Paper Number: SPE-120636-MS
... Abstract Accurate prediction of the average plunger rise velocity is important to optimally unload liquid from a plunger lifted well. A modified Foss and Gaul model presented in this paper predicts the minimum build casing pressure criteria to open the motor controlled valve for a selected...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, April 4–8, 2009
Paper Number: SPE-119377-MS
... holdup valve society of petroleum engineers Introduction What is "Batch Pumping, and what is "Downhole Liquid Holdup"? The term "Batch Pumping" is derived from the chemical industry, which has processes that usually fall into one of two categories: batch or continuous. In a continuous process...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, April 4–8, 2009
Paper Number: SPE-120494-MS
... Abstract The Backside Auto - Injection System (BAIS) is designed to allow gas to be injected into the packerless production tubing/casing annulus intermittently without having to pull the tubing and install gas-lift mandrels and valves. This is accomplished by using a single portable wellhead...
Proceedings Papers

Paper presented at the Production and Operations Symposium, March 31–April 3, 2007
Paper Number: SPE-106011-MS
.... Wells equipped with permanent downhole measurement equipment or control valves, and especially those with both, are nowadays known as smart well or intelligent completion. Since the first intelligent completion was installed in August 1997 at Saga's Snorre Tension Leg Platform in the North Sea, over 300...
Proceedings Papers

Paper presented at the Production and Operations Symposium, March 31–April 3, 2007
Paper Number: SPE-106092-MS
... with all but the lowermost NRV open. All the rotating ball valves are closed. The lower most NRV is set to open at a downstream pressure equal to the venturi throat pressure. The fluid in the well bore pushes against the NRV. Step2 The venturi consist of a converging tube which is an efficient...
Proceedings Papers

Paper presented at the Production and Operations Symposium, March 31–April 3, 2007
Paper Number: SPE-106640-MS
... by controlling perforations and valve settings. However, real-time optimum control of flow is still a challenge. To this end, we have developed an advanced method for optimization of production based on a feed-back optimum control concept. The method allows optimization of inflow-control–device operation...
Proceedings Papers

Paper presented at the Production and Operations Symposium, March 31–April 3, 2007
Paper Number: SPE-107041-MS
... into the pump, the gas would generally be separated at bottom hole, then enter the annulus between the tubing and the casing (tubing-casing annulus), eventually flow in air or enter oil pipeline by many control valves at wellhead. In this system, the gas is a potential damage factor to the pump. So the pump...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, April 16–19, 2005
Paper Number: SPE-94016-MS
... increases, extended cup life, and reduced operating expenses have been achieved. Both mechanisms to shift the shaft and close the bypass flow valve have detrimental side effects. Until recently, all cup designs available to the industry used elastomeric cups with outside diameters in excess...